Sample Record

Owner Lab

  • CT HQ - Sacramento Structural Materials Testing Laboratory

DIME Sample ID 2018-12-14-2

Sample is locked from editing. info

Project Information

Project IdentifiersProject ID: 209694
DEA: 080J0704
EFIS: 0800000282
DIST-CO-RTE-PM08-SBD-215-0.6/1.7
Award Date10/17/2017
Closeout Date04/23/2020
Work Description(Alternative Delivery) The CMGC project will reconstruct and improve interchange of I-215 and Barton Road in the City of Grand Terrace, CA.
Location DescriptionGrade separation at Intersection of I-215 and Barton Road near Grand Terrace, CA. ? On I-215 between I-10 and SR-60.
QA Service Level1 (Verified on 12/11/2017)

Sample Information

Sample Taken Date12/14/2018 Sample Unique Key2
Will the laboratory/organization for which you are a member perform testing on this material sample?Yes Date that the sample was received by the laboratory/organization performing the testing12/14/2018
Sample typeQuality Assurance A brief description of the sampleResistance welded hoops
The quantity of what the sample constitutes5 From where was the sample collectedSource
First name of sampler or witnessed byTory Last name of sampler or witnessed byMcLaurin
Title of samplerQuality Assurance Inspector Telephone number of sampler6616185971
Laboratory sample identificationUnknown Linked DIME Sample IDUnknown
The fabricator/manufacturer/facility nameRKR Steel Welding Transportation Laboratory (TL) NumberUnknown
Inspector Lot Number from the Transportation Laboratory (TL) FormUnknown Structure unique identifierNot set
Structure nameNot set

Material Information

Material TypeSMTL TM5 - Welded Hoops Production or Authorization TestingProduction Testing
Service or UltimateUltimate Rebar Heat Number(s)xxx
Hoop Manufacturer Lot Number(s)xxx Material Standard CodeASTM A706
Material Grade60 Rebar Size8
Diameter of Hoop3'-8" Epoxy CoatedNo
Epoxy Coating ColorNA Rebar Manufacturerxxx
Welding CompanyRKR Steel Welding Coating StandardsUncoated
Weld TypeFlash Welded

Submitted Tests

DIME Test IDTest MethodTester Name, Testing LabDate TestedSubmitted ByVerified?Release DateTest CommentsActions
2018-12-14-2-1CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Tensile)Fred, CT HQ - Sacramento Structural Materials Testing Laboratory12/19/2018Fred
Yes
12/27/2018Bar Broke; OK Necking
2018-12-14-2-2CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Tensile)Fred, CT HQ - Sacramento Structural Materials Testing Laboratory12/19/2018Fred
Yes
12/27/2018Bar Broke; OK Necking
2018-12-14-2-3CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Tensile)Fred, CT HQ - Sacramento Structural Materials Testing Laboratory12/19/2018Fred
Yes
12/27/2018Bar Broke; OK Necking
2018-12-14-2-4CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Tensile)Fred, CT HQ - Sacramento Structural Materials Testing Laboratory12/19/2018Fred
Yes
12/27/2018Bar Broke in Heat Affected Zone; OK Necking
2018-12-14-2-5CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Tensile)Fred, CT HQ - Sacramento Structural Materials Testing Laboratory12/19/2018Fred
Yes
12/27/2018Bar Broke; OK Necking
2018-12-14-2-6CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Tensile)Fred, CT HQ - Sacramento Structural Materials Testing Laboratory12/19/2018Fred
Yes
12/27/2018Bar Broke; OK Necking
2018-12-14-2-7CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Tensile)Fred, CT HQ - Sacramento Structural Materials Testing Laboratory12/19/2018Fred
Yes
12/27/2018Bar Broke; OK Necking
2018-12-14-2-8CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Tensile)Fred, CT HQ - Sacramento Structural Materials Testing Laboratory12/19/2018Fred
Yes
12/27/2018Bar Broke; OK Necking
2018-12-14-2-9CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Tensile)Fred, CT HQ - Sacramento Structural Materials Testing Laboratory12/19/2018Fred
Yes
12/27/2018Bar Broke; OK Necking
2018-12-14-2-10CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Tensile)Fred, CT HQ - Sacramento Structural Materials Testing Laboratory12/19/2018Fred
Yes
12/27/2018Bar Broke; OK Necking

Sample File Attachments

File NameExtensionDate UploadedActions
No results found.

Test File Attachments


DIME Test ID: 2018-12-14-2-1 CTM 670-December 2013 (Verified)
DIME Test ID: 2018-12-14-2-2 CTM 670-December 2013 (Verified)
DIME Test ID: 2018-12-14-2-3 CTM 670-December 2013 (Verified)
DIME Test ID: 2018-12-14-2-4 CTM 670-December 2013 (Verified)
DIME Test ID: 2018-12-14-2-5 CTM 670-December 2013 (Verified)
DIME Test ID: 2018-12-14-2-6 CTM 670-December 2013 (Verified)
DIME Test ID: 2018-12-14-2-7 CTM 670-December 2013 (Verified)
DIME Test ID: 2018-12-14-2-8 CTM 670-December 2013 (Verified)
DIME Test ID: 2018-12-14-2-9 CTM 670-December 2013 (Verified)
DIME Test ID: 2018-12-14-2-10 CTM 670-December 2013 (Verified)