Project Information

Project IdentifiersProject ID: 212997
DEA: 023H2104
EFIS: 0217000070
DIST-CO-RTE-PM02-PLU-70,89-53.5/58.4,21.0/29.9
Award Date03/02/2018
Closeout Date01/09/2019
Work DescriptionAC OVERLAY, REPLACE AC SURFACE, GUARDRAIL, SHOULDER BACKING
Location DescriptionPLUMAS COUNTY ON ROUTE 70 FROM GREENHORN RANCH ROAD TO 0.2 MILE EAST OF SLOAT ROAD AND ON ROUTE 89 FROM 0.3 MILE SOUTH OF ALTA CAMP ROAD TO CANYON DAM PICNIC AREA
QA Service Level1 (Verified on 02/02/2018)

Sample Information

Sample Taken Date05/22/2018 Sample Unique Key18
Will the laboratory/organization for which you are a member perform testing on this material sample?Yes Date that the sample was received by the laboratory/organization performing the testing05/23/2018
Sample typeVerification A brief description of the sampleCombined RAP
The quantity of what the sample constitutesJMF Verification From where was the sample collectedManufacturer
First name of sampler or witnessed byCheryl Last name of sampler or witnessed byAbraham
Title of samplerUnknown Telephone number of samplerUnknown
Laboratory sample identificationD77412 Linked DIME Sample IDUnknown
The fabricator/manufacturer/facility nameLockwood Hot Plant Transportation Laboratory (TL) Number894818
Inspector Lot Number from the Transportation Laboratory (TL) FormJMF 18-13-S1 Structure unique identifierNot set
Structure nameNot set

Material Information

Material TypeReclaimed Asphalt Pavement RAP SourceLockwood Hot Plant
Aggregate SizeUnknown Aggregate SourceUnknown
RAP StockpileContinuous Stockpile Size (tons)20000
Reclaimed Asphalt Pavement Mix NumberNot set HMA PayNo

JMF Information

Verification IDJMF3513-2018-44 Date Created11/26/2018
JMF Submittal IDJMF3511-22-2018-61 JMF StatusSubmittal Rejected For Use
Producer Mix ID3866 Rejected Date11/27/2018

Submitted Tests

DIME Test IDTest MethodTester Name, Testing LabDate TestedSubmitted ByVerified?Release DateTest CommentsActions
2018-05-22-18-1AASHTO T308-10: Standard Method of Test for Determining the Asphalt Binder Content of Hot Mix Asphalt (HMA) by the Ignition Method (Method A) (Asphalt Binder Content)Colt Sweeny, CT D02 - Redding Northern Regional Laboratory05/25/2018Ward Jenkins
Yes
11/26/2018
2018-05-22-18-2AASHTO T30-15: Standard Method of Test for Mechanical Analysis of Extracted Aggregate (Mechanical Analysis)NRML-R, CT D02 - Redding Northern Regional Laboratory05/28/2018Ward Jenkins
Yes
11/26/2018
2018-05-22-18-3AASHTO T209-12: Standard Method of Test for Theoretical Maximum Specific Gravity (Gmm) and Density of Asphalt Mixtures (Maximum Specific Gravity)Mike Cruz, CT D02 - Redding Northern Regional Laboratory05/26/2018Ward Jenkins
Yes
11/26/2018

Sample File Attachments

File NameExtensionDate UploadedActions
No results found.

Test File Attachments


DIME Test ID: 2018-05-22-18-1 AASHTO T308-10 (Verified)
DIME Test ID: 2018-05-22-18-2 AASHTO T30-15 (Verified)
DIME Test ID: 2018-05-22-18-3 AASHTO T209-12 (Verified)