Sample Record

Owner Lab

  • CT D09 - Bishop Field Laboratory

DIME Sample ID 2018-06-28-4

Project Information

Project IdentifiersProject ID: 212408
DEA: 09350804
EFIS: 0900020055
DIST-CO-RTE-PM09-MNO-395-80.6/84.1
Award Date07/14/2017
Closeout Date01/06/2020
Work DescriptionCONSTRUCT PULVERIZED ROADBED, HMA AND ANCHORED WIRE MESH SYSTEM.
Location DescriptionMONO COUNTY NEAR BRIDGEPORT FROM BUCKEYE ROAD TO 2.9 MILES SOUTH OF SWAUGER CANYON ROAD
QA Service Level1 (Verified on 05/03/2018)

Sample Information

Sample Taken Date06/28/2018 Sample Unique Key4
Will the laboratory/organization for which you are a member perform testing on this material sample?No Date that the sample was received by the laboratory/organization performing the testing07/02/2018
Sample typeQuality Assurance A brief description of the sampleRAP Pile
The quantity of what the sample constitutes1 day From where was the sample collectedSource
First name of sampler or witnessed byUnknown Last name of sampler or witnessed byPlant Employee
Title of sampler Telephone number of sampler
Laboratory sample identification Linked DIME Sample ID
The fabricator/manufacturer/facility nameRoad and Highway Builders Transportation Laboratory (TL) Number
Inspector Lot Number from the Transportation Laboratory (TL) Form Structure unique identifierNot set
Structure nameNot set

Material Information

Material TypeReclaimed Asphalt Pavement RAP SourceHoneywell Nevada
Aggregate Size Aggregate Source
RAP Stockpile Stockpile Size (tons)
Reclaimed Asphalt Pavement Mix NumberNot set HMA PayNo

Submitted Tests

DIME Test IDTest MethodTester Name, Testing LabDate TestedSubmitted ByVerified?Release DateTest CommentsActions
No results found.

Sample File Attachments

File NameExtensionDate UploadedActions
No results found.

Test File Attachments