Sample Record

Owner Lab

  • CT HQ - Sacramento Structural Materials Testing Laboratory

DIME Sample ID 2018-05-17-13

Sample is locked from editing. info

Project Information

Project IdentifiersProject ID: 209695
DEA: 08347704
EFIS: 0800000616
DIST-CO-RTE-PM08-SBD-SR-58-0/12.9
Award Date11/10/2017
Closeout Date01/14/2021
Work Description(Alternative Delivery) The CMGC project will upgrade SR 58 from 2- to 4-lanes in San Bernardino County from the Kern County line to 7.5 miles east of US-395.
Location DescriptionSR-58 / 395 Kramer Junction project. In San Bernardino County from the Kern County line to 7.5 miles east of US-395.
QA Service Level1 (Verified on 12/01/2017)

Sample Information

Sample Taken Date05/17/2018 Sample Unique Key13
Will the laboratory/organization for which you are a member perform testing on this material sample?Yes Date that the sample was received by the laboratory/organization performing the testing05/23/2018
Sample typeQuality Assurance A brief description of the samplesize 8 flashwelded hoop
The quantity of what the sample constitutes450 From where was the sample collectedFabricator
First name of sampler or witnessed byPrakash Last name of sampler or witnessed byPatel
Title of samplerUnknown Telephone number of samplerUnknown
Laboratory sample identificationUnknown Linked DIME Sample IDUnknown
The fabricator/manufacturer/facility nameRKR Steel Welding Transportation Laboratory (TL) NumberC952777
Inspector Lot Number from the Transportation Laboratory (TL) FormL11-009-18 Structure unique identifierNot set
Structure nameNot set

Material Information

Material TypeSMTL TM5 - Welded Hoops Production or Authorization TestingAuthorization Testing
Service or UltimateUltimate Rebar Heat Number(s)65027876
Hoop Manufacturer Lot Number(s)7 Material Standard CodeASTM A706
Material Grade60 Rebar Size8
Diameter of Hoop5'-8" Epoxy CoatedNo
Epoxy Coating ColorNA Rebar ManufacturerGERDAUE
Welding CompanyRKR Steel Welding Coating StandardsUncoated
Weld TypeFlash Welded

Submitted Tests

DIME Test IDTest MethodTester Name, Testing LabDate TestedSubmitted ByVerified?Release DateTest CommentsActions
2018-05-17-13-1CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Tensile)Fred, CT HQ - Sacramento Structural Materials Testing Laboratory05/23/2018Fred
Yes
05/30/2018Bar Broke in Weld
2018-05-17-13-2CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Tensile)Fred, CT HQ - Sacramento Structural Materials Testing Laboratory05/23/2018Fred
Yes
05/30/2018Bar Broke; OK Necking
2018-05-17-13-3CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Tensile)Fred, CT HQ - Sacramento Structural Materials Testing Laboratory05/23/2018Fred
Yes
05/30/2018Bar Broke; OK Necking
2018-05-17-13-4CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Tensile)Fred, CT HQ - Sacramento Structural Materials Testing Laboratory05/23/2018Fred
Yes
05/30/2018Bar Broke; OK Necking

Sample File Attachments

File NameExtensionDate UploadedActions
No results found.

Test File Attachments


DIME Test ID: 2018-05-17-13-1 CTM 670-December 2013 (Verified)
DIME Test ID: 2018-05-17-13-2 CTM 670-December 2013 (Verified)
DIME Test ID: 2018-05-17-13-3 CTM 670-December 2013 (Verified)
DIME Test ID: 2018-05-17-13-4 CTM 670-December 2013 (Verified)