Sample Record

Owner Lab

  • CT HQ - QASI Los Angeles Field Office

DIME Sample ID 2017-12-18-21

Sample is locked from editing. info

Project Information

Project IdentifiersProject ID: 210569
DEA: 083555V4
EFIS: 0814000086
DIST-CO-RTE-PM08-SBD-15-42.5/46.0
Award Date11/05/2015
Closeout Date01/18/2022
Work DescriptionWIDEN I-15, RECONSTRUCT 3 IC'S, CONSTRUCT 2 NEW BR AND WIDEN 3 BR.
Location DescriptionSAN BERNARDINO COUNTY IN VICTORVILLE FROM 0.5 MILE NORTH OF MOJAVE DRIVE TO 1.5 MILE NORTH OF STODDARD WELLS ROAD OVERCROSSING
QA Service Level1 (Verified on 10/15/2015)

Sample Information

Sample Taken Date12/18/2017 Sample Unique Key21
Will the laboratory/organization for which you are a member perform testing on this material sample?Yes Date that the sample was received by the laboratory/organization performing the testing01/10/2018
Sample typeQuality Assurance A brief description of the sampleBarGrip XL Coupler
The quantity of what the sample constitutes1 lot From where was the sample collectedJob Site
First name of sampler or witnessed byRavinder Last name of sampler or witnessed bySingh
Title of samplerQA Telephone number of sampler9165247768
Laboratory sample identificationUnknown Linked DIME Sample IDUnknown
The fabricator/manufacturer/facility nameSouthcoast Steel Transportation Laboratory (TL) NumberUnknown
Inspector Lot Number from the Transportation Laboratory (TL) FormL53-217-17 Structure unique identifierNot set
Structure nameNot set

Material Information

Material TypeSMTL TM5 - Couplers Production or Authorization TestingProduction Testing
Service or UltimateUltimate Material Standard CodeASTM A706
Material Grade60 Rebar ManufacturerGerdau
Coupler ManufacturerBar Grip Intermediate Assembler or FabricatorIntegrity Rebar
Rebar Size10 Coupler ModelXL
Coating StandardsUncoated Shape of RebarStraight
Rebar Hoop DiameterUnknown Rebar Hoop FabricatorUnknown
Coupler Component Heat/Lot Number(s) 71073403 Rebar Heat Number(s)65027978
Rebar Size 2 Not set Coupler Unique IDNot set

Submitted Tests

DIME Test IDTest MethodTester Name, Testing LabDate TestedSubmitted ByVerified?Release DateTest CommentsActions
2017-12-18-21-1CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Tensile Slip)Fred, CT HQ - Sacramento Structural Materials Testing Laboratory01/16/2018Fred
Yes
01/23/2018necking okay
2017-12-18-21-2CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Tensile Slip)Fred, CT HQ - Sacramento Structural Materials Testing Laboratory01/16/2018Fred
Yes
01/23/2018necking okay
2017-12-18-21-3CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Tensile Slip)Fred, CT HQ - Sacramento Structural Materials Testing Laboratory01/16/2018Fred
Yes
01/23/2018necking okay

Sample File Attachments

File NameExtensionDate UploadedActions
No results found.

Test File Attachments


DIME Test ID: 2017-12-18-21-1 CTM 670-December 2013 (Verified)
DIME Test ID: 2017-12-18-21-2 CTM 670-December 2013 (Verified)
DIME Test ID: 2017-12-18-21-3 CTM 670-December 2013 (Verified)