Sample Record

Owner Lab

  • CT D02 - Redding Northern Regional Laboratory

DIME Sample ID 2017-04-07-22

Sample is locked from editing. info

Project Information

Project IdentifiersProject ID: 99999
DEA: 0322222
DIST-CO-RTE-PM03-SAC,OMG-888,99,80-0.6-0.6
Award DateNot set
Closeout DateNot set
Work DescriptionTHIS PROJECT RECORD WAS ADDED FOR DIME TESTERS - DATA SUBMITTED FOR THIS PROJECT SHOULD NOT BE USED FOR ANY OTHER PURPOSES.
Location DescriptionTHIS PROJECT RECORD WAS ADDED FOR DIME TESTERS - DATA SUBMITTED FOR THIS PROJECT SHOULD NOT BE USED FOR ANY OTHER PURPOSES.
QA Service Level (Verified on 04/05/2013)

Sample Information

Sample Taken Date04/07/2017 Sample Unique Key22
Will the laboratory/organization for which you are a member perform testing on this material sample?Yes Date that the sample was received by the laboratory/organization performing the testing04/07/2017
Sample typeQuality Control A brief description of the sampleRAP - Chem 2
The quantity of what the sample constitutesJMF From where was the sample collectedManufacturer
First name of sampler or witnessed bya Last name of sampler or witnessed bya
Title of samplerUnknown Telephone number of samplerUnknown
Laboratory sample identificationJMF 17-01-S1 Linked DIME Sample IDUnknown
The fabricator/manufacturer/facility nameHat Creek - Shaw Pit Facility Transportation Laboratory (TL) NumberUnknown
Inspector Lot Number from the Transportation Laboratory (TL) FormUnknown Structure unique identifierNot set
Structure nameNot set

Material Information

Material TypeReclaimed Asphalt Pavement RAP SourceShaw Pit
Aggregate Size3/8-inch Aggregate SourceUnknown
RAP Stockpile Stockpile Size (tons)Unknown
Reclaimed Asphalt Pavement Mix NumberNot set

JMF Information

HMA Design IDJMF3512-2017-3 Date Created12/12/2017
SubmittalN/A

Submitted Tests

DIME Test IDTest MethodTester Name, Testing LabDate TestedSubmitted ByVerified?Release DateTest CommentsActions
2017-04-07-22-1AASHTO T308-10: Standard Method of Test for Determining the Asphalt Binder Content of Hot Mix Asphalt (HMA) by the Ignition Method (Method A) (Asphalt Binder Content)Ward Jenkins, CT D02 - Redding Northern Regional Laboratory04/07/2017Ward Jenkins
Yes
03/22/2018AASHTO T 164 result is reported. - BETA TESTING - not for use
2017-04-07-22-2AASHTO T30-15: Standard Method of Test for Mechanical Analysis of Extracted Aggregate (Mechanical Analysis)Ward Jenkins, CT D02 - Redding Northern Regional Laboratory04/07/2017Ward Jenkins
Yes
12/20/20171/4-inch result is fabricated.
2017-04-07-22-3AASHTO T164-14: Standard Method of Test for Quantitative Extraction of Asphalt Binder from Hot Mix Asphalt (HMA) (Asphalt Binder Content)Ward Jenkins, CT D02 - Redding Northern Regional Laboratory12/15/2017Ward Jenkins
Yes
12/15/2017
2017-04-07-22-4AASHTO T209-12: Standard Method of Test for Theoretical Maximum Specific Gravity (Gmm) and Density of Asphalt Mixtures (Maximum Specific Gravity)Ward Jenkins, CT D02 - Redding Northern Regional Laboratory04/07/2017Ward Jenkins
Yes
12/20/2017

Sample File Attachments

File NameExtensionDate UploadedActions
No results found.

Test File Attachments


DIME Test ID: 2017-04-07-22-1 AASHTO T308-10 (Verified)
DIME Test ID: 2017-04-07-22-2 AASHTO T30-15 (Verified)
DIME Test ID: 2017-04-07-22-3 AASHTO T164-14 (Verified)
DIME Test ID: 2017-04-07-22-4 AASHTO T209-12 (Verified)