Owner Lab
- CT HQ - Sacramento Structural Materials Testing Laboratory
DIME Sample ID 2017-03-23-8
Sample is locked from editing. info
Project Information
Project Identifiers | Project ID: 209141 DEA: 07215954 EFIS: 0700001835 |
DIST-CO-RTE-PM | 07-LA-5-0.0/7.6 |
Award Date | 04/24/2014 |
Closeout Date | 07/14/2022 |
Work Description | WIDENING FREEWAY AND RECONSTRUCT OVERHEAD AND OVERCROSSING STRUCTURES |
Location Description | LOS ANGELES COUNTY IN LA MIRADA, SANTA FE SPRINGS, NORWALK AND DOWNEY FROM ORANGE COUNTY/LOS ANGELES COUNTY LIMIT LINES TO 0.7 MILE NORTH OF ROUTE 605 |
QA Service Level | 1 (Verified on 06/02/2014) |
Sample Information
Sample Taken Date | 03/23/2017 |
Sample Unique Key | 8 |
Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes |
Date that the sample was received by the laboratory/organization performing the testing | 03/27/2017 |
Sample type | Quality Assurance |
A brief description of the sample | Flash Welded Rebar Hoops |
The quantity of what the sample constitutes | 12 |
From where was the sample collected | Fabricator |
First name of sampler or witnessed by | Kevin |
Last name of sampler or witnessed by | Churchill |
Title of sampler | Unknown |
Telephone number of sampler | Unknown |
Laboratory sample identification | Unknown |
Linked DIME Sample ID | Unknown |
The fabricator/manufacturer/facility name | RKR Welding |
Transportation Laboratory (TL) Number | C970918 |
Inspector Lot Number from the Transportation Laboratory (TL) Form | L0201017 |
Structure unique identifier | Not set |
Structure name | Not set |
---|
Material Information
Material Type | SMTL TM5 - Welded Hoops |
Production or Authorization Testing | Authorization Testing |
Service or Ultimate | Ultimate |
Rebar Heat Number(s) | 65025286 |
Hoop Manufacturer Lot Number(s) | 76, 82, 85 |
Material Standard Code | ASTM A706 |
Material Grade | 60 |
Rebar Size | 6 |
Diameter of Hoop | 2'-6" |
Epoxy Coated | No |
Epoxy Coating Color | NA |
Rebar Manufacturer | RKR |
Welding Company | RKR Steel Welding |
Coating Standards | Uncoated |
Weld Type | Flash Welded |
---|
Submitted Tests
DIME Test ID | Test Method | Tester Name | Testing Lab | Date Tested | Submitted By | Verified? | Release Date | Test Comments | Actions |
2017-03-23-8-1 | CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Tensile) | Brian | CT HQ - Sacramento Structural Materials Testing Laboratory | 03/28/2017 | Brian | Yes | 04/05/2017 | Bar Broke; OK Necking | |
2017-03-23-8-2 | CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Tensile) | Brian | CT HQ - Sacramento Structural Materials Testing Laboratory | 03/28/2017 | Brian | Yes | 04/05/2017 | Bar Broke; OK Necking | |
2017-03-23-8-3 | CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Tensile) | Brian | CT HQ - Sacramento Structural Materials Testing Laboratory | 03/28/2017 | Brian | Yes | 04/05/2017 | Bar Broke; OK Necking | |
2017-03-23-8-4 | CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Tensile) | Brian | CT HQ - Sacramento Structural Materials Testing Laboratory | 03/28/2017 | Brian | Yes | 04/05/2017 | Bar Broke; OK Necking | |
2017-03-23-8-5 | CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Tensile) | Brian | CT HQ - Sacramento Structural Materials Testing Laboratory | 03/28/2017 | Brian | Yes | 04/05/2017 | Bar Broke; OK Necking | |
2017-03-23-8-6 | CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Tensile) | Brian | CT HQ - Sacramento Structural Materials Testing Laboratory | 03/28/2017 | Brian | Yes | 04/05/2017 | Bar Broke; OK Necking | |
2017-03-23-8-7 | CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Tensile) | Brian | CT HQ - Sacramento Structural Materials Testing Laboratory | 03/28/2017 | Brian | Yes | 04/05/2017 | Bar Broke; OK Necking | |
2017-03-23-8-8 | CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Tensile) | Brian | CT HQ - Sacramento Structural Materials Testing Laboratory | 03/28/2017 | Brian | Yes | 04/05/2017 | Bar Broke; OK Necking | |
2017-03-23-8-9 | CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Tensile) | Brian | CT HQ - Sacramento Structural Materials Testing Laboratory | 03/28/2017 | Brian | Yes | 04/05/2017 | Bar Broke; OK Necking | |
243362433724338243392434024341243422434324344