Sample Record

Owner Lab

  • CT D07 - Materials Field Laboratory, Unit 1953

DIME Sample ID 2024-07-21-7

Sample is locked from editing. info

Project Information

Project IdentifiersProject ID: 994943
DEA: 07328304
EFIS: 0716000175
DIST-CO-RTE-PM07-LA-10-28.2/31.0
Award Date09/26/2023
Closeout DateNot set
Work DescriptionCONSTRUCT BRIDGE CLOSURE POUR.
Location DescriptionLOS ANGELES COUNTY AT VARIOUS LOCATIONS IN EL MONTE AND BALDWIN PARK FROM RIO HONDO BRIDGE TO SAN GABRIEL RIVER BRIDGE
QA Service Level1 (Verified on 08/03/2023)

Sample Information

Sample Taken Date07/21/2024 Sample Unique Key7
Will the laboratory/organization for which you are a member perform testing on this material sample?Yes Date that the sample was received by the laboratory/organization performing the testing07/22/2024
Sample typeAcceptance A brief description of the sample4X8 PCC cylinders
The quantity of what the sample constitutes130 CY From where was the sample collectedJob Site
First name of sampler or witnessed byGraham Last name of sampler or witnessed byVelek
Title of samplerAssistant Structure Representative Telephone number of sampler
Laboratory sample identification24-173 Linked DIME Sample ID
The fabricator/manufacturer/facility nameCTS SHORT LOAD RAPID SET Transportation Laboratory (TL) Number07-328304-1
Inspector Lot Number from the Transportation Laboratory (TL) Form Structure unique identifier
Structure name Bid ItemNot set

Material Information

Material TypeConcrete The concrete mix design numberCTS-72-EHI
The truck number from where the sample was collected1 The batch plant ticket number from where the sample was collectedNA
Concrete batch plantCTS short load concrete The fabricator/manufacturer designation for the sample
A detailed description of where the material sample was collectedtruck chute Where the material sample would have been placed if not sampled
From Lot No. Bag Lot No.

Submitted Tests

DIME Test IDTest MethodTester Name, Testing LabDate TestedDate AddedVerified?Release DateTest CommentsPrivacy LevelActions
2024-07-21-7-1THIS TEST HAS BEEN SUPERSEDED.
CTM 521-June 2020: Method of Test for Compressive Strength of Molded Concrete Cylinders
Robert Achuela, CT D07 - Materials Field Laboratory, Unit 195307/22/202407/23/2024
Yes
07/23/2024THIS TEST HAS BEEN SUPERSEDED.
Public - Test Data Visible
2024-07-21-7-2THIS TEST HAS BEEN SUPERSEDED.
CTM 521-June 2020: Method of Test for Compressive Strength of Molded Concrete Cylinders
Robert Achuela, CT D07 - Materials Field Laboratory, Unit 195307/22/202407/23/2024
Yes
07/23/2024THIS TEST HAS BEEN SUPERSEDED.
Public - Test Data Visible
2024-07-21-7-3CTM 521-June 2020: Method of Test for Compressive Strength of Molded Concrete CylindersArnold Truong, CT D07 - Materials Field Laboratory, Unit 195307/24/202407/29/2024
Yes
07/29/2024Public - Test Data Visible

Sample File Attachments

File NameExtensionDate UploadedActions
No results found.

Test File Attachments


DIME Test ID: 2024-07-21-7-1 CTM 521-June 2020 (Verified)
DIME Test ID: 2024-07-21-7-2 CTM 521-June 2020 (Verified)
DIME Test ID: 2024-07-21-7-3 CTM 521-June 2020 (Verified)