Project Details
This page displays current information for project DEA: 07328304.
Project Information
Project Identifiers | Project ID: 994943 DEA: 07328304 EFIS: 0716000175 |
---|---|
DIST-CO-RTE-PM | 07-LA-10-28.2/31.0 |
Award Date | 09/26/2023 |
Closeout Date | Not set |
Work Description | CONSTRUCT BRIDGE CLOSURE POUR. |
Location Description | LOS ANGELES COUNTY AT VARIOUS LOCATIONS IN EL MONTE AND BALDWIN PARK FROM RIO HONDO BRIDGE TO SAN GABRIEL RIVER BRIDGE |
QA Service Level | 1 (Verified on 08/03/2023) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
Email Address | Full Name | Role | Personnel Source |
---|---|---|---|
jeffrey.yu@dot.ca.gov | Jeffrey Yu | METS REP | Caltrans METS REP DB |
Samples
Samples submitted for this project.
Displaying 1-3 of 3 results.
DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
---|---|---|---|---|---|
2024-09-08-9 | 09/08/2024 | 09/09/2024 | Acceptance | Aggregate | View |
2024-09-08-8 | 09/08/2024 | 09/09/2024 | Acceptance | Aggregate | View |
2024-07-21-7 | 07/21/2024 | 07/22/2024 | Acceptance | Concrete | View |
Job Mix Formula (JMF)
JMFs associated with this project.
JMF ID | Status | Submitted By | Created By | Date Created | Link |
---|---|---|---|---|---|
No results found. |
Environmental Product Declaration (EPD)
EPDs material quantities submitted for this project.
Declaration Number | Material Type | Vendor | Submitted by | Quantity |
---|---|---|---|---|
No results found. |
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods