Sample Record

DIME Sample ID 2024-02-08-3

Project Information

Project IdentifiersProject ID: 994820
DEA: 060V1104
EFIS: 0616000208
DIST-CO-RTE-PM06-FRE,KIN-5,41,198-Var
Award Date08/31/2023
Closeout Date05/09/2025
Work DescriptionSTRATFORD KINGS RIVER BRIDGE REPLACEMENT.
Location DescriptionFRESNO AND KINGS COUNTIES AT VARIOUS LOCATIONS
QA Service Level1 (Verified on 09/20/2023)

Owner Lab

  • CT HQ - QASI Los Angeles Field Office

Sample Information

Sample Taken Date02/08/2024 Sample Unique Key3
Date that the sample was received by the laboratory/organization performing the testingNot set Sample typeQuality Control
A brief description of the sample#6 3'-11.5" The quantity of what the sample constitutes128
From where was the sample collectedFabricator First name of sampler or witnessed byAdrian
Last name of sampler or witnessed bySanchez Title of sampler
Telephone number of sampler2137133499 Laboratory sample identification
Linked DIME Sample ID The fabricator/manufacturer/facility nameRKR Steel Welding
Transportation Laboratory (TL) Number Inspector Lot Number from the Transportation Laboratory (TL) FormL159-021-24
Structure unique identifier Structure name
Bid ItemNot set

Material Information

Material TypeSMTL TM5 - Welded Hoops Production or Authorization TestingProduction Testing
Service or UltimateUltimate Rebar Heat Number(s)6044616
Hoop Manufacturer Lot Number(s)1 Material Standard CodeASTM A706
Material Grade60 Rebar Size#6
Diameter of Hoop3'-11.5" Epoxy CoatedNo
Epoxy Coating ColorNA Rebar ManufacturerCMC Steel Oklahoma
Welding CompanyRKR Steel Welding Coating StandardsUncoated
Weld TypeFlash Welded

Submitted Tests

DIME Test IDTest MethodTester Name, Testing LabDate TestedDate AddedVerified?Release DateTest CommentsPrivacy LevelActions
No results found.

Sample File Attachments

File NameExtensionDate UploadedActions
No results found.

Test File Attachments