Sample Record

DIME Sample ID 2016-07-21-4

Sample is locked from editing. info

Project Information

Project IdentifiersProject ID: 209135
DEA: 04235844
EFIS: 0400000684
COOP: 042493
DIST-CO-RTE-PM04-SM-101-16.3/17.06
Award Date06/25/2014
Closeout Date12/17/2019
Work DescriptionRECONSTRUCT OVERCROSSING, RETAINING WALLS, GROUND IMPROVEMENT,
Location DescriptionBURLINGAME
QA Service Level1 (Verified on 10/03/2013)

Owner Lab

  • CT HQ - Sacramento Structural Materials Testing Laboratory

Sample Information

Sample Taken Date07/21/2016 Sample Unique Key4
Date that the sample was received by the laboratory/organization performing the testing07/22/2016 Sample typeQuality Assurance
A brief description of the sampleBarGrip XL Coupler The quantity of what the sample constitutes4
From where was the sample collectedJob Site First name of sampler or witnessed byMacasio
Last name of sampler or witnessed byCasas Title of samplerUnknown
Telephone number of samplerUnknown Laboratory sample identificationUnknown
Linked DIME Sample IDUnknown The fabricator/manufacturer/facility nameBarsplice, Nucor
Transportation Laboratory (TL) NumberC581396 Inspector Lot Number from the Transportation Laboratory (TL) FormN/A
Structure unique identifierNot set Structure nameNot set
Bid ItemNot set

Material Information

Material TypeSMTL TM5 - Couplers Production or Authorization TestingProduction Testing
Service or UltimateUltimate Material Standard CodeASTM A706
Material Grade60 Rebar ManufacturerNucor
Coupler ManufacturerBarsplice Intermediate Assembler or FabricatorUnknown
Rebar Size#6 Coupler ModelBarGrip XL
Coating StandardsUncoated Shape of RebarStraight
Rebar Hoop DiameterUnknown Rebar Hoop FabricatorUnknown
Coupler Component Heat/Lot Number(s)2M60886 Rebar Heat Number(s)PL15108051, PL15208070
Rebar Size 2 NA Coupler Unique IDNot set

Submitted Tests

DIME Test IDTest MethodTester Name, Testing LabDate TestedDate AddedVerified?Release DateTest CommentsPrivacy LevelActions
2016-07-21-4-1CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Tensile Slip)Fred, CT HQ - Sacramento Structural Materials Testing Laboratory07/22/201607/22/2016
Yes
07/25/2016OK NeckingPublic - Test Data Visible
2016-07-21-4-2CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Tensile Slip)Fred, CT HQ - Sacramento Structural Materials Testing Laboratory07/22/201607/22/2016
Yes
07/25/2016OK NeckingPublic - Test Data Visible
2016-07-21-4-3CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Tensile Slip)Fred, CT HQ - Sacramento Structural Materials Testing Laboratory07/22/201607/22/2016
Yes
07/25/2016OK NeckingPublic - Test Data Visible

Sample File Attachments

File NameExtensionDate UploadedActions
No results found.

Test File Attachments


DIME Test ID: 2016-07-21-4-1 CTM 670-December 2013 (Verified)
DIME Test ID: 2016-07-21-4-2 CTM 670-December 2013 (Verified)
DIME Test ID: 2016-07-21-4-3 CTM 670-December 2013 (Verified)