Sample Record
DIME Sample ID 2023-10-30-99
Project Information
| Project Identifiers | Project ID: 212246 DEA: 053307A4 EFIS: 0514000027 |
|---|---|
| DIST-CO-RTE-PM | 05-SLO-46-49.7/54.6 |
| Award Date | 02/16/2022 |
| Closeout Date | 09/02/2025 |
| Work Description | Cholame Segment |
| Location Description | Not set |
| QA Service Level | 1 (Verified on 09/30/2019) |
Owner Lab
- CT HQ - Sacramento Hot Mix Asphalt Laboratory
Sample Information
| Sample Taken Date | 10/30/2023 | Sample Unique Key | 99 |
|---|---|---|---|
| Date that the sample was received by the laboratory/organization performing the testing | 01/11/2024 | Sample type | Dispute Resolution |
| A brief description of the sample | RAP | The quantity of what the sample constitutes | 1 Bags RAP |
| From where was the sample collected | Source | First name of sampler or witnessed by | Kyle |
| Last name of sampler or witnessed by | Engen | Title of sampler | TET |
| Telephone number of sampler | Laboratory sample identification | 024-005 | |
| Linked DIME Sample ID | The fabricator/manufacturer/facility name | SPM AVENAL | |
| Transportation Laboratory (TL) Number | C979514 | Inspector Lot Number from the Transportation Laboratory (TL) Form | |
| Structure unique identifier | Structure name | ||
| Bid Item | Not set |
Material Information
| Material Type | Reclaimed Asphalt Pavement | RAP Source | SPM Avenal |
|---|---|---|---|
| Aggregate Size | Aggregate Source | ||
| RAP Stockpile | Static | Stockpile Size (tons) | |
| Reclaimed Asphalt Pavement Mix Number |
Submitted Tests
Sample File Attachments
| File Name | Extension | Date Uploaded | Actions |
|---|---|---|---|
| No results found. | |||
Test File Attachments
DIME Test ID: 2023-10-30-99-1 AASHTO T209-12 (Verified)
DIME Test ID: 2023-10-30-99-2 AASHTO T30-19 (Verified)