Sample Record
Owner Lab
- CT HQ - QASI Los Angeles Field Office
DIME Sample ID 2023-12-29-1
Project Information
Project Identifiers | Project ID: 994820 DEA: 060V1104 EFIS: 0616000208 |
---|---|
DIST-CO-RTE-PM | 06-FRE,KIN-5,41,198-Var |
Award Date | 08/31/2023 |
Closeout Date | Not set |
Work Description | STRATFORD KINGS RIVER BRIDGE REPLACEMENT. |
Location Description | FRESNO AND KINGS COUNTIES AT VARIOUS LOCATIONS |
QA Service Level | 1 (Verified on 09/20/2023) |
Sample Information
Sample Taken Date | 12/29/2023 | Sample Unique Key | 1 |
---|---|---|---|
Will the laboratory/organization for which you are a member perform testing on this material sample? | No | Date that the sample was received by the laboratory/organization performing the testing | 01/03/2024 |
Sample type | Quality Assurance | A brief description of the sample | #6 2'-4" |
The quantity of what the sample constitutes | 3198 | From where was the sample collected | Fabricator |
First name of sampler or witnessed by | Adrian | Last name of sampler or witnessed by | Sanchez |
Title of sampler | Telephone number of sampler | 2137133499 | |
Laboratory sample identification | Linked DIME Sample ID | ||
The fabricator/manufacturer/facility name | TNT Rebar | Transportation Laboratory (TL) Number | |
Inspector Lot Number from the Transportation Laboratory (TL) Form | L159-288-23 | Structure unique identifier | |
Structure name |
Material Information
Material Type | SMTL TM5 - Welded Hoops | Production or Authorization Testing | Production Testing |
---|---|---|---|
Service or Ultimate | Ultimate | Rebar Heat Number(s) | 1202055162 |
Hoop Manufacturer Lot Number(s) | 1-22 | Material Standard Code | ASTM A706 |
Material Grade | 60 | Rebar Size | #6 |
Diameter of Hoop | 2'-4" | Epoxy Coated | No |
Epoxy Coating Color | NA | Rebar Manufacturer | NUCOR |
Welding Company | TNT Rebar | Coating Standards | Uncoated |
Weld Type | Flash Welded |
Submitted Tests
Sample File Attachments
File Name | Extension | Date Uploaded | Actions |
---|---|---|---|
No results found. |
Test File Attachments
DIME Test ID: 2023-12-29-1-1 CTM 670-December 2013 (Verified)
DIME Test ID: 2023-12-29-1-2 CTM 670-December 2013 (Verified)
DIME Test ID: 2023-12-29-1-3 CTM 670-December 2013 (Verified)
DIME Test ID: 2023-12-29-1-4 CTM 670-December 2013 (Verified)
DIME Test ID: 2023-12-29-1-5 CTM 670-December 2013 (Verified)
DIME Test ID: 2023-12-29-1-6 CTM 670-December 2013 (Verified)
DIME Test ID: 2023-12-29-1-7 CTM 670-December 2013 (Verified)
DIME Test ID: 2023-12-29-1-8 CTM 670-December 2013 (Verified)
DIME Test ID: 2023-12-29-1-9 CTM 670-December 2013 (Verified)
DIME Test ID: 2023-12-29-1-11 CTM 670-December 2013 (Verified)
DIME Test ID: 2023-12-29-1-12 CTM 670-December 2013 (Verified)
DIME Test ID: 2023-12-29-1-13 CTM 670-December 2013 (Verified)
DIME Test ID: 2023-12-29-1-14 CTM 670-December 2013 (Verified)
DIME Test ID: 2023-12-29-1-15 CTM 670-December 2013 (Verified)
DIME Test ID: 2023-12-29-1-16 CTM 670-December 2013 (Verified)
DIME Test ID: 2023-12-29-1-17 CTM 670-December 2013 (Verified)
DIME Test ID: 2023-12-29-1-18 CTM 670-December 2013 (Verified)
DIME Test ID: 2023-12-29-1-19 CTM 670-December 2013 (Verified)