Sample Record
DIME Sample ID 2023-12-11-24
Project Information
| Project Identifiers | Project ID: 212246 DEA: 053307A4 EFIS: 0514000027 |
|---|---|
| DIST-CO-RTE-PM | 05-SLO-46-49.7/54.6 |
| Award Date | 02/16/2022 |
| Closeout Date | 09/02/2025 |
| Work Description | Cholame Segment |
| Location Description | Not set |
| QA Service Level | 1 (Verified on 09/30/2019) |
Owner Lab
- CT HQ - FFS - Skid Testing
Sample Information
| Sample Taken Date | 12/11/2023 | Sample Unique Key | 24 |
|---|---|---|---|
| Date that the sample was received by the laboratory/organization performing the testing | 12/11/2023 | Sample type | Department Acceptance |
| A brief description of the sample | Skid Portable | The quantity of what the sample constitutes | Skid Testing |
| From where was the sample collected | Job Site | First name of sampler or witnessed by | Jessie |
| Last name of sampler or witnessed by | Wilson | Title of sampler | |
| Telephone number of sampler | Laboratory sample identification | ||
| Linked DIME Sample ID | The fabricator/manufacturer/facility name | Job Site | |
| Transportation Laboratory (TL) Number | Inspector Lot Number from the Transportation Laboratory (TL) Form | ||
| Structure unique identifier | Structure name | Highway 46 Mainline WB | |
| Bid Item | Not set |
Material Information
| Material Type | Roadway/Bridge Surface | Pavement Surface Type | CRCP (Continuously Reinforced Concrete Pavement) |
|---|---|---|---|
| Type of Traffic Control Provided | N/A | DIST-CO-RTE | 05-SLO-46 |
| Direction of Travel | West | Post Mile | 52.96 |
| Lanes to be Tested | Shoulder | Station |
Submitted Tests
Sample File Attachments
| File Name | Extension | Date Uploaded | Actions |
|---|---|---|---|
| No results found. | |||
Test File Attachments
DIME Test ID: 2023-12-11-24-1 CTM 342-August 2012 (Verified)