Sample Record

DIME Sample ID 2023-11-17-1

Sample is locked from editing. info

Project Information

Project IdentifiersProject ID: 214487
DEA: 120Q9304
EFIS: 1217000128
DIST-CO-RTE-PM12-ORA-5,133,241-122,241-var
Award Date05/09/2022
Closeout Date12/01/2025
Work Description12-0Q930, SHOPP RESERVATION BRIDGE PROJECT - BRIDGE UPGRADE, WINGWALL, SUBSTRUCTURE, DECK, SPALL, JOINT SEAL, CONC.
Location DescriptionORANGE COUNTY AT VARIOUS LOCATIONS
QA Service Level1 (Verified on 12/10/2020)

Owner Lab

  • CT HQ - QASI Los Angeles Field Office

Sample Information

Sample Taken Date11/17/2023 Sample Unique Key1
Date that the sample was received by the laboratory/organization performing the testing12/01/2023 Sample typeQuality Assurance
A brief description of the sample3/4 x 3 A325 High Strength Bolt Assembly The quantity of what the sample constitutes400
From where was the sample collectedDistributor First name of sampler or witnessed byJacob
Last name of sampler or witnessed byGarcia Title of samplerCT METS QA INSPECTOR
Telephone number of sampler3109128014 Laboratory sample identification
Linked DIME Sample ID The fabricator/manufacturer/facility nameCordova Bolt Inc.
Transportation Laboratory (TL) Number Inspector Lot Number from the Transportation Laboratory (TL) FormL169-055-23
Structure unique identifier Structure name
Bid ItemNot set

Material Information

Material TypeSMTL TM3 - Fastener Assembly Rocap Number(s)
Heat Number(s)Bolt- 10828270, Nut-8000022215 Washer- 32320750 Lock Washer- 10752420 Nut Mfg. Lot Number(s)W000037844
Washer Mfg. Lot Number(s)0723-793, 20211608 Bolt SpecificationASTM A325
Bolt Length(s)3 Nut SpecificationASTM A 563
Washer SpecificationASTM F436 FinishASTM F2329 HDG
Diameter/Size3/4 Bolt Mfg. Lot NumberE234L1
Rocap Test Requirement(s)Sung Tight Connection, No rocap. Lubricant Requirements(s)
Washer Inner Diameter(s) Bolt Mill SupplierNot set
Nut Mill SupplierNot set Washer Mill SupplierNot set

Submitted Tests

DIME Test IDTest MethodTester Name, Testing LabDate TestedDate AddedVerified?Release DateTest CommentsPrivacy LevelActions
2023-11-17-1-1ASTM F606-21: Standard Test Methods for Determining the Mechanical Properties of Externally and Internally Threaded Fasteners, Washers, Direct Tension Indicators, and Rivets (Proof Load)<None>, CT HQ - Sacramento Structural Materials Testing Laboratory12/06/202312/06/2023
Yes
12/12/2023Proof LoadPublic - Test Data Visible
2023-11-17-1-2ASTM F606-21: Standard Test Methods for Determining the Mechanical Properties of Externally and Internally Threaded Fasteners, Washers, Direct Tension Indicators, and Rivets (Proof Load)<None>, CT HQ - Sacramento Structural Materials Testing Laboratory12/06/202312/06/2023
Yes
12/12/2023Proof LoadPublic - Test Data Visible
2023-11-17-1-3ASTM F606-21: Standard Test Methods for Determining the Mechanical Properties of Externally and Internally Threaded Fasteners, Washers, Direct Tension Indicators, and Rivets (Proof Load with Wedge)aauvinen, CT HQ - Sacramento Structural Materials Testing Laboratory12/06/202312/06/2023
Yes
12/12/2023Wedge TensilePublic - Test Data Visible
2023-11-17-1-4ASTM F606-21: Standard Test Methods for Determining the Mechanical Properties of Externally and Internally Threaded Fasteners, Washers, Direct Tension Indicators, and Rivets (Proof Load with Wedge)aauvinen, CT HQ - Sacramento Structural Materials Testing Laboratory12/06/202312/06/2023
Yes
12/12/2023Wedge TensilePublic - Test Data Visible
2023-11-17-1-5ASME B1.2-83r17: (Ring Gage) Gages and Gaging for Unified Inch Screw Threads - Errata May 1992 (Ring Gage)Andrew Auvinen, CT HQ - Sacramento Structural Materials Testing Laboratory12/08/202312/08/2023
Yes
12/12/2023Public - Test Data Visible
2023-11-17-1-6ASME B1.2-83r17: (Ring Gage) Gages and Gaging for Unified Inch Screw Threads - Errata May 1992 (Ring Gage)Andrew Auvinen, CT HQ - Sacramento Structural Materials Testing Laboratory12/08/202312/08/2023
Yes
12/12/2023Public - Test Data Visible
2023-11-17-1-7ASME B1.2-83r17: (Ring Gage) Gages and Gaging for Unified Inch Screw Threads - Errata May 1992 (Ring Gage)Andrew Auvinen, CT HQ - Sacramento Structural Materials Testing Laboratory12/08/202312/08/2023
Yes
12/12/2023Public - Test Data Visible
2023-11-17-1-8ASME B1.2-83r17: (Plug Gage) Gages and Gaging for Unified Inch Screw Threads - Errata May 1992 (Plug Gage)Andrew Auvinen, CT HQ - Sacramento Structural Materials Testing Laboratory12/08/202312/08/2023
Yes
12/12/2023Public - Test Data Visible
2023-11-17-1-9ASME B1.2-83r17: (Plug Gage) Gages and Gaging for Unified Inch Screw Threads - Errata May 1992 (Plug Gage)Andrew Auvinen, CT HQ - Sacramento Structural Materials Testing Laboratory12/08/202312/08/2023
Yes
12/12/2023Public - Test Data Visible
2023-11-17-1-10ASME B1.2-83r17: (Plug Gage) Gages and Gaging for Unified Inch Screw Threads - Errata May 1992 (Plug Gage)Andrew Auvinen, CT HQ - Sacramento Structural Materials Testing Laboratory12/08/202312/08/2023
Yes
12/12/2023Public - Test Data Visible

Sample File Attachments

File NameExtensionDate UploadedActions
No results found.

Test File Attachments


DIME Test ID: 2023-11-17-1-1 ASTM F606-21 (Verified)
DIME Test ID: 2023-11-17-1-2 ASTM F606-21 (Verified)
DIME Test ID: 2023-11-17-1-3 ASTM F606-21 (Verified)
DIME Test ID: 2023-11-17-1-4 ASTM F606-21 (Verified)
DIME Test ID: 2023-11-17-1-5 ASME B1.2-83r17 (Verified)
DIME Test ID: 2023-11-17-1-6 ASME B1.2-83r17 (Verified)
DIME Test ID: 2023-11-17-1-7 ASME B1.2-83r17 (Verified)
DIME Test ID: 2023-11-17-1-8 ASME B1.2-83r17 (Verified)
DIME Test ID: 2023-11-17-1-9 ASME B1.2-83r17 (Verified)
DIME Test ID: 2023-11-17-1-10 ASME B1.2-83r17 (Verified)
DIME Test ID: 2023-11-17-1-11 ASTM B499-09r21 (Verified)
DIME Test ID: 2023-11-17-1-12 ASTM B499-09r21 (Verified)
DIME Test ID: 2023-11-17-1-13 ASTM B499-09r21 (Verified)
DIME Test ID: 2023-11-17-1-14 ASTM B499-09r21 (Verified)
DIME Test ID: 2023-11-17-1-15 ASTM B499-09r21 (Verified)
DIME Test ID: 2023-11-17-1-16 ASTM B499-09r21 (Verified)
DIME Test ID: 2023-11-17-1-17 ASTM B499-09r21 (Verified)
DIME Test ID: 2023-11-17-1-18 ASTM B499-09r21 (Verified)
DIME Test ID: 2023-11-17-1-19 ASTM B499-09r21 (Verified)
DIME Test ID: 2023-11-17-1-20 ASTM B499-09r21 (Verified)
DIME Test ID: 2023-11-17-1-21 ASTM B499-09r21 (Verified)
DIME Test ID: 2023-11-17-1-22 ASTM B499-09r21 (Verified)
DIME Test ID: 2023-11-17-1-23 ASTM E18-20 (Verified)
DIME Test ID: 2023-11-17-1-24 ASTM E18-20 (Verified)
DIME Test ID: 2023-11-17-1-25 ASTM E18-20 (Verified)