Sample Record
DIME Sample ID 2023-08-25-58
Project Information
| Project Identifiers | Project ID: 994537 DEA: 010L1604 EFIS: 0121000077 |
|---|---|
| DIST-CO-RTE-PM | 01-MEN-1,101-Var |
| Award Date | 06/07/2023 |
| Closeout Date | 06/18/2025 |
| Work Description | POLYESTER CONCRETE OVERLAY, RAPID SETTING CONCRETE (PATCH), HMA. |
| Location Description | MENDOCINO COUNTY AT VARIOUS LOCATIONS |
| QA Service Level | 1 (Verified on 04/25/2023) |
Owner Lab
- T.P.A Construction Incorporated
Sample Information
| Sample Taken Date | 08/25/2023 | Sample Unique Key | 58 |
|---|---|---|---|
| Date that the sample was received by the laboratory/organization performing the testing | 08/25/2023 | Sample type | Preliminary |
| A brief description of the sample | CTS Rapid Set Cement | The quantity of what the sample constitutes | 1 BAGS |
| From where was the sample collected | Supplier | First name of sampler or witnessed by | Pavel |
| Last name of sampler or witnessed by | Tyukayev | Title of sampler | |
| Telephone number of sampler | Laboratory sample identification | ||
| Linked DIME Sample ID | 2023-08-25-57 | The fabricator/manufacturer/facility name | CTS Cement Manufacturing Corp. |
| Transportation Laboratory (TL) Number | Inspector Lot Number from the Transportation Laboratory (TL) Form | 225082523D | |
| Structure unique identifier | Structure name | ||
| Bid Item | Not set |
Material Information
| Material Type | Rapid Set | Manufacturer | CTS Cement Manufacturing Corporation |
|---|---|---|---|
| Mix no. | 0 | Materials Received | YES |
| Lot no. | 225082523D | Batch Number | 225082523D |
Submitted Tests
| DIME Test ID | Test Method | Tester Name, Testing Lab | Date Tested | Date Added | Verified? | Release Date | Test Comments | Privacy Level | Actions |
|---|---|---|---|---|---|---|---|---|---|
| No results found. | |||||||||
Sample File Attachments
| File Name | Extension | Date Uploaded | Actions |
|---|---|---|---|
| No results found. | |||
