This page displays current information for project DEA: 010L1604.
Project Information
Project Identifiers | Project ID: 994537 DEA: 010L1604 EFIS: 0121000077 |
---|---|
DIST-CO-RTE-PM | 01-MEN-1,101-Var |
Award Date | 06/07/2023 |
Closeout Date | Not set |
Work Description | POLYESTER CONCRETE OVERLAY, RAPID SETTING CONCRETE (PATCH), HMA. |
Location Description | MENDOCINO COUNTY AT VARIOUS LOCATIONS |
QA Service Level | 1 (Verified on 04/25/2023) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
Email Address | Full Name | Role | Personnel Source |
---|---|---|---|
roozbeh.hadipour@dot.ca.gov | Roozbeh Hadipour | Resident Engineer | Caltrans RE DB |
william.cudney@dot.ca.gov | Will Cudney | Structural Representative | Caltrans SR DB |
peter.gan@dot.ca.gov | Peter Gan | METS REP | Caltrans METS REP DB |
Samples
Samples submitted for this project.
Displaying 1-4 of 4 results.
DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
---|---|---|---|---|---|
2024-06-27-86 | 06/27/2024 | 07/23/2024 | Quality Assurance | SMTL TM3 - Fastener Assembly | View |
2024-03-20-4 | 03/20/2024 | 03/20/2024 | Department Acceptance | Roadway/Bridge Surface | View |
2023-11-27-8 | 11/27/2023 | 11/27/2023 | Department Acceptance | Roadway/Bridge Surface | View |
2023-08-25-58 | 08/25/2023 | 08/25/2023 | Preliminary | Rapid Set | View |
Job Mix Formula (JMF)
JMFs associated with this project.
JMF ID | Status | Submitted By | Created By | Date Created | Link |
---|---|---|---|---|---|
No results found. |
Environmental Product Declaration (EPD)
EPDs material quantities submitted for this project.
Declaration Number | Material Type | Vendor | Submitted by | Quantity |
---|---|---|---|---|
No results found. |
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods