Sample Record

DIME Sample ID 2023-03-06-14

Project Information

Project IdentifiersProject ID: 214951
DEA: 120K0234
EFIS: 1214000100
DIST-CO-RTE-PM12-ORA-5-17.1/18.9
Award Date09/23/2020
Closeout Date02/09/2026
Work DescriptionSouth County Improvement Project (Phase 3 - El Toro/Alicia) WIDEN FREEWAY AND BRIDGES, RECONSTRUCT BRIDGE AND WALLS.
Location DescriptionORANGE COUNTY IN MISSION VIEJO, LAGUNA HILLS, LAGUNA WOODS AND LAKE FOREST FROM 0.4 MILE SOUTH OF ALICIA PARKWAY OVERCROSSING TO 0.2 MILE NORTH OF EL TORO ROAD UNDERCROSSING
QA Service Level1 (Verified on 10/01/2020)

Owner Lab

  • CT D12 - Huntington Beach Field Laboratory

Sample Information

Sample Taken Date03/06/2023 Sample Unique Key14
Date that the sample was received by the laboratory/organization performing the testing03/09/2023 Sample typeRecertification
A brief description of the sample3/4 HMA-A The quantity of what the sample constitutes16 boxes of 3/4 HMA-A, 4 bags of Agg, 3 bags of RAP, 4 cans of oil, 1 can of antistrip
From where was the sample collectedManufacturer First name of sampler or witnessed byDavid
Last name of sampler or witnessed byNguyen Title of sampler
Telephone number of sampler Laboratory sample identification23-0187
Linked DIME Sample ID The fabricator/manufacturer/facility nameAAA-Irvine
Transportation Laboratory (TL) Number Inspector Lot Number from the Transportation Laboratory (TL) Form
Structure unique identifier Structure name
Bid ItemNot set

Material Information

Material TypeHot Mix Asphalt HMA TypeType A HMA
HMA Grading3/4 inch Lot number
Sublot number HMA Mix Number
Binder content (%)Not set Virgin binder PGNot set
Design binder PGNot set Binder SupplierNot set
RAP content (%)Not set WMA AdditivesNot set
Antistrip typeNot set

Submitted Tests

DIME Test IDTest MethodTester Name, Testing LabDate TestedDate AddedVerified?Release DateTest CommentsPrivacy LevelActions
No results found.

Sample File Attachments

File NameExtensionDate UploadedActions
No results found.

Test File Attachments