Sample Record

DIME Sample ID 2023-02-11-10

Project Information

Project IdentifiersProject ID: 215003
DEA: 040J6204
EFIS: 0414000019
DIST-CO-RTE-PM04-ALA-680-12.4/21.9
Award Date04/12/2022
Closeout DateNot set
Work DescriptionREHABILITATE PAVEMENT - RPL APP/DEP SLABS, 14 BRIDGES
Location DescriptionALAMEDA COUNTY AT SUNOL AND IN PLEASANTON AND DUBLIN FROM KOOPMANN ROAD UNDERCROSSING TO ALAMEDA COUNTY LINE
QA Service Level1 (Verified on 10/19/2020)

Owner Lab

  • CT D04 - San Jose Construction Field Laboratory

Sample Information

Sample Taken Date02/11/2023 Sample Unique Key10
Date that the sample was received by the laboratory/organization performing the testing02/13/2023 Sample typeQuality Assurance
A brief description of the sampleA set of 3 RSC beams. The quantity of what the sample constitutes130 yd3
From where was the sample collectedManufacturer First name of sampler or witnessed byRobert
Last name of sampler or witnessed byLohman Title of sampler
Telephone number of sampler Laboratory sample identificationSJ-021123-BS1
Linked DIME Sample ID The fabricator/manufacturer/facility nameSecurity Paving company
Transportation Laboratory (TL) Number Inspector Lot Number from the Transportation Laboratory (TL) Form
Structure unique identifier Structure nameHwy 680 NB
Bid ItemNot set

Material Information

Material TypeConcrete The concrete mix design numberG3-22-PRS-319
The truck number from where the sample was collected The batch plant ticket number from where the sample was collectedload 11
Concrete batch plantSecurity Paving Company The fabricator/manufacturer designation for the sample
A detailed description of where the material sample was collectedDischarge from back of concrete truck into loader bucket. Where the material sample would have been placed if not sampled
From Lot No. Bag Lot No.

Submitted Tests

DIME Test IDTest MethodTester Name, Testing LabDate TestedDate AddedVerified?Release DateTest CommentsPrivacy LevelActions
2023-02-11-10-1CTM 524-March 2013: Method of Test for Flexural Strength Of Rapid Strength ConcreteRobert Lohman, CT D04 - San Jose Construction Field Laboratory02/12/202303/21/2023
Yes
03/22/2023Specimen #1 @ 10hr. Break. Specimen #2 @ 15hr. Break. Specimen #3 @ 15hr. Break.Public - Test Data Visible

Sample File Attachments

File NameExtensionDate UploadedActions
No results found.

Test File Attachments


DIME Test ID: 2023-02-11-10-1 CTM 524-March 2013 (Verified)