Sample Record
Owner Lab
- CT D08 - Barstow Field Laboratory 1
DIME Sample ID 2023-02-21-20
Project Information
| Project Identifiers | Project ID: 212112 DEA: 080C2514 EFIS: 0816000076 COOP: 081645 |
|---|---|
| DIST-CO-RTE-PM | 08-SBD-10-0.0/13.2 |
| Award Date | 06/06/2018 |
| Closeout Date | Not set |
| Work Description | Design-Build of I-10 Corridor Contract 1 - Adding 2 new Express Lanes |
| Location Description | LA/SBD County Line to PM 13.2 near I-15 |
| QA Service Level | 1 (Verified on 10/16/2019) |
Sample Information
| Sample Taken Date | 02/21/2023 | Sample Unique Key | 20 |
|---|---|---|---|
| Date that the sample was received by the laboratory/organization performing the testing | 02/21/2023 | Sample type | Quality Assurance |
| A brief description of the sample | SOIL | The quantity of what the sample constitutes | 17600SQF |
| From where was the sample collected | Job Site | First name of sampler or witnessed by | RIGOBERTO |
| Last name of sampler or witnessed by | ARROYO | Title of sampler | Caltrans Consultant |
| Telephone number of sampler | Laboratory sample identification | 02212023TEST 03 | |
| Linked DIME Sample ID | The fabricator/manufacturer/facility name | CTM 231 TEST LOCATION | |
| Transportation Laboratory (TL) Number | Inspector Lot Number from the Transportation Laboratory (TL) Form | ||
| Structure unique identifier | Structure name | ||
| Bid Item | Not set |
Material Information
| Material Type | Soil | The fabricator's/manufacturer's product name for the sample | |
|---|---|---|---|
| The fabricator/manufacturer designation for the sample | A detailed description of where the material sample was collected | AT THE JOBSITE | |
| Where the material sample would have been placed if not sampled |
Submitted Tests
Sample File Attachments
| File Name | Extension | Date Uploaded | Actions |
|---|---|---|---|
| No results found. | |||
Test File Attachments
DIME Test ID: 2023-02-21-20-1 CTM 231-March 2013 (Verified)
