Sample Record

DIME Sample ID 2015-06-15-3

Project Information

Project IdentifiersProject ID: 209217
DEA: 080F5404
EFIS: 0800000136
COOP: 081468
DIST-CO-RTE-PM08-RIV-91,15-0.0/13.04, 35.64/45.14
Award Date09/09/2013
Closeout Date09/20/2023
Work DescriptionSR-91 Corridor Improvement Project: Develop approx. 8 miles of tolled express lanes and related improvements within SR 91 between the Riverside/Orange County line and I-15, including transition areas.
Location Description08-RIV-91-0.0/13.04; 12-ORA-91-R14.43/R18.91; 08-RIV-15-35.64/45.14
QA Service Level1 (Verified on 08/07/2014)

Owner Lab

  • CT D08 - Fontana Southern Regional Laboratory

Sample Information

Sample Taken Date06/15/2015 Sample Unique Key3
Date that the sample was received by the laboratory/organization performing the testing06/18/2015 Sample typeQuality Assurance
A brief description of the sampleConcrete Cylinders The quantity of what the sample constitutes12
From where was the sample collectedJob Site First name of sampler or witnessed byJ
Last name of sampler or witnessed bySevilla Title of samplerConsultant
Telephone number of samplerUnknown Laboratory sample identificationSRL 59
Linked DIME Sample IDUnknown The fabricator/manufacturer/facility nameSite
Transportation Laboratory (TL) NumberSRL 59 Inspector Lot Number from the Transportation Laboratory (TL) FormUnknown
Structure unique identifierUnknown Structure nameUnknown
Bid ItemNot set

Material Information

Material TypeConcrete The concrete mix design numberCM56421
The truck number from where the sample was collected631 The batch plant ticket number from where the sample was collected118027048
Concrete batch plantUnknown The fabricator/manufacturer designation for the sampleUnknown
A detailed description of where the material sample was collectedLoad 7 Where the material sample would have been placed if not sampledBR 25 Deck
From Lot No.Not set Bag Lot No.Not set

Submitted Tests

DIME Test IDTest MethodTester Name, Testing LabDate TestedDate AddedVerified?Release DateTest CommentsPrivacy LevelActions
2015-06-15-3-1CTM 521-November 2014: Method of Test for Compressive Strength of Molded Concrete CylindersMatthew Clayton, CT D08 - Fontana Southern Regional Laboratory06/22/2015
Yes
07/06/2015Public - Test Data Visible
2015-06-15-3-2CTM 521-November 2014: Method of Test for Compressive Strength of Molded Concrete CylindersMatthew Clayton, CT D08 - Fontana Southern Regional Laboratory06/25/2015
Yes
07/06/2015Public - Test Data Visible
2015-06-15-3-3CTM 521-November 2014: Method of Test for Compressive Strength of Molded Concrete CylindersMatthew Clayton, CT D08 - Fontana Southern Regional Laboratory06/29/2015
Yes
07/06/2015Public - Test Data Visible
2015-06-15-3-4CTM 521-November 2014: Method of Test for Compressive Strength of Molded Concrete CylindersMatthew Clayton, CT D08 - Fontana Southern Regional Laboratory07/06/2015
Yes
07/06/2015Public - Test Data Visible
2015-06-15-3-6CTM 521-November 2014: Method of Test for Compressive Strength of Molded Concrete CylindersMatthew Clayton, CT D08 - Fontana Southern Regional Laboratory07/27/2015
Yes
08/12/2015Public - Test Data Visible

Sample File Attachments

File NameExtensionDate UploadedActions
No results found.

Test File Attachments


DIME Test ID: 2015-06-15-3-1 CTM 521-November 2014 (Verified)
DIME Test ID: 2015-06-15-3-2 CTM 521-November 2014 (Verified)
DIME Test ID: 2015-06-15-3-3 CTM 521-November 2014 (Verified)
DIME Test ID: 2015-06-15-3-4 CTM 521-November 2014 (Verified)
DIME Test ID: 2015-06-15-3-6 CTM 521-November 2014 (Verified)