Sample Record

DIME Sample ID 2022-09-22-65

Project Information

Project IdentifiersProject ID: 212246
DEA: 053307A4
EFIS: 0514000027
DIST-CO-RTE-PM05-SLO-46-49.7/54.6
Award Date02/16/2022
Closeout Date09/02/2025
Work DescriptionCholame Segment
Location DescriptionNot set
QA Service Level1 (Verified on 09/30/2019)

Owner Lab

  • CT D05 - Whitley Gardens Field Laboratory

Sample Information

Sample Taken Date09/22/2022 Sample Unique Key65
Date that the sample was received by the laboratory/organization performing the testing09/23/2022 Sample typeQuality Assurance
A brief description of the sample4x8 concrete cylinders The quantity of what the sample constitutesCCB Left Abutment
From where was the sample collectedJob Site First name of sampler or witnessed byTim
Last name of sampler or witnessed byStover Title of samplerInspector
Telephone number of sampler Laboratory sample identification
Linked DIME Sample ID The fabricator/manufacturer/facility nameCalPortland
Transportation Laboratory (TL) Number Inspector Lot Number from the Transportation Laboratory (TL) Form
Structure unique identifier Structure nameCCB Left Abutment
Bid ItemNot set

Material Information

Material TypeConcrete The concrete mix design number710RN2010
The truck number from where the sample was collected The batch plant ticket number from where the sample was collectedNA
Concrete batch plant The fabricator/manufacturer designation for the sample
A detailed description of where the material sample was collectedConcrete Mix Truck Where the material sample would have been placed if not sampled
From Lot No. Bag Lot No.

Submitted Tests

DIME Test IDTest MethodTester Name, Testing LabDate TestedDate AddedVerified?Release DateTest CommentsPrivacy LevelActions
2022-09-22-65-1CTM 521-June 2020: Method of Test for Compressive Strength of Molded Concrete CylindersKyle Engen, CT D05 - Whitley Gardens Field Laboratory10/20/202210/20/2022
Yes
10/20/2022Public - Test Data Visible

Sample File Attachments

File NameExtensionDate UploadedActions
No results found.

Test File Attachments


DIME Test ID: 2022-09-22-65-1 CTM 521-June 2020 (Verified)
File NameExtensionDate UploadedTest IDActions
05-3307A4_CTM 521_KEE_221020_CCB Left Abutment_28 Day_3x_1pdf10/20/20222022-09-22-65-1   Info