Sample Record

Owner Lab

  • CT D05 - Whitley Gardens Field Laboratory

DIME Sample ID 2022-10-13-2

Project Information

Project IdentifiersProject ID: 212246
DEA: 053307A4
EFIS: 0514000027
DIST-CO-RTE-PM05-SLO-46-49.7/54.6
Award Date02/16/2022
Closeout Date09/02/2025
Work DescriptionCholame Segment
Location DescriptionNot set
QA Service Level1 (Verified on 09/30/2019)

Sample Information

Sample Taken Date10/13/2022 Sample Unique Key2
Will the laboratory/organization for which you are a member perform testing on this material sample?Yes Date that the sample was received by the laboratory/organization performing the testing10/13/2022
Sample typeQuality Assurance A brief description of the sampleBridge Deck Pour
The quantity of what the sample constitutesCCB Bridge Deck From where was the sample collectedJob Site
First name of sampler or witnessed byKyle Last name of sampler or witnessed byEngen
Title of samplerTET Telephone number of sampler805-540-9933
Laboratory sample identification Linked DIME Sample ID
The fabricator/manufacturer/facility nameCalPortland Paso Robles Transportation Laboratory (TL) Number
Inspector Lot Number from the Transportation Laboratory (TL) Form Structure unique identifier
Structure nameCCB Bridge Deck Bid ItemNot set

Material Information

Material TypeConcrete The concrete mix design number800RHS2260
The truck number from where the sample was collected The batch plant ticket number from where the sample was collectedUnknown
Concrete batch plant The fabricator/manufacturer designation for the sample
A detailed description of where the material sample was collectedSample was collected from middle of concrete batch for truck Where the material sample would have been placed if not sampled
From Lot No. Bag Lot No.

Submitted Tests

DIME Test IDTest MethodTester Name, Testing LabDate TestedDate AddedVerified?Release DateTest CommentsPrivacy LevelActions
2022-10-13-2-1CTM 521-June 2020: Method of Test for Compressive Strength of Molded Concrete CylindersBrandon Wood, CT D05 - Whitley Gardens Field Laboratory10/13/202210/13/2022
Yes
10/13/2022Public - Test Data Visible

Sample File Attachments

File NameExtensionDate UploadedActions
No results found.

Test File Attachments


DIME Test ID: 2022-10-13-2-1 CTM 521-June 2020 (Verified)
File NameExtensionDate UploadedTest IDActions
05-3307A4_CTM 521_KEE_221013_CCB Deck_42 Day_3x_1pdf10/13/20222022-10-13-2-1   Info