Project Information

Project IdentifiersProject ID: 209217
DEA: 080F5404
EFIS: 0800000136
COOP: 081468
DIST-CO-RTE-PM08-RIV-91,15-0.0/13.04, 35.64/45.14
Award Date09/09/2013
Closeout Date09/20/2023
Work DescriptionSR-91 Corridor Improvement Project: Develop approx. 8 miles of tolled express lanes and related improvements within SR 91 between the Riverside/Orange County line and I-15, including transition areas.
Location Description08-RIV-91-0.0/13.04; 12-ORA-91-R14.43/R18.91; 08-RIV-15-35.64/45.14
QA Service Level1 (Verified on 08/07/2014)

Owner Lab

  • CT HQ - Sacramento Structural Materials Testing Laboratory

Sample Information

Sample Taken Date09/20/2022 Sample Unique Key51
Date that the sample was received by the laboratory/organization performing the testing10/13/2022 Sample typeQuality Assurance
A brief description of the sample#6 HRC 500/510 Couplers The quantity of what the sample constitutes150 Couplers
From where was the sample collectedJob Site First name of sampler or witnessed byAntonio
Last name of sampler or witnessed byViramontes Title of sampler
Telephone number of sampler Laboratory sample identification
Linked DIME Sample ID The fabricator/manufacturer/facility nameCMC
Transportation Laboratory (TL) Number Inspector Lot Number from the Transportation Laboratory (TL) Form
Structure unique identifier Structure name
Bid ItemNot set

Material Information

Material TypeSMTL TM5 - Couplers Production or Authorization TestingProduction Testing
Service or UltimateUltimate Material Standard CodeASTM A706
Material Grade60 Rebar ManufacturerCMC
Coupler ManufacturerHRC Intermediate Assembler or Fabricator
Rebar Size#6 Coupler ModelHRC 500/510
Coating StandardsUncoated Shape of RebarStraight
Rebar Hoop Diameter Rebar Hoop Fabricator
Coupler Component Heat/Lot Number(s)79001079 Rebar Heat Number(s)4121272
Rebar Size 2 Coupler Unique IDTP-17-03

Submitted Tests

DIME Test IDTest MethodTester Name, Testing LabDate TestedDate AddedVerified?Release DateTest CommentsPrivacy LevelActions
2022-09-20-51-1CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Cyclical/Fatique Tensile with Slip)spaine, CT HQ - Sacramento Structural Materials Testing Laboratory10/13/202210/13/2022
Yes
10/14/2022ok neckingPublic - Test Data Visible
2022-09-20-51-2CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Cyclical/Fatique Tensile with Slip)spaine, CT HQ - Sacramento Structural Materials Testing Laboratory10/13/202210/13/2022
Yes
10/14/2022ok neckingPublic - Test Data Visible
2022-09-20-51-3CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Cyclical/Fatique Tensile with Slip)spaine, CT HQ - Sacramento Structural Materials Testing Laboratory10/13/202210/13/2022
Yes
10/14/2022ok neckingPublic - Test Data Visible

Sample File Attachments

File NameExtensionDate UploadedActions
No results found.

Test File Attachments


DIME Test ID: 2022-09-20-51-1 CTM 670-December 2013 (Verified)
DIME Test ID: 2022-09-20-51-2 CTM 670-December 2013 (Verified)
DIME Test ID: 2022-09-20-51-3 CTM 670-December 2013 (Verified)