Sample Record

DIME Sample ID 2022-08-08-2

Project Information

Project IdentifiersProject ID: 214989
DEA: 050L7224
EFIS: 0515000098
DIST-CO-RTE-PM05-SLO-1-34.5
Award Date10/13/2021
Closeout Date11/25/2024
Work DescriptionREPLACE BRIDGE.
Location DescriptionSAN LUIS OBISPO COUNTY NEAR MORRO BAY AT OLD CREEK BRIDGE
QA Service Level1 (Verified on 09/03/2020)

Owner Lab

  • CT HQ - QASI Los Angeles Field Office

Sample Information

Sample Taken Date08/08/2022 Sample Unique Key2
Date that the sample was received by the laboratory/organization performing the testingNot set Sample typeQuality Control
A brief description of the sample#7 X 2'-6" Ultimate Welded Hoops Lot 7 thru Lot 10 The quantity of what the sample constitutes394
From where was the sample collectedManufacturer First name of sampler or witnessed byLorenzo
Last name of sampler or witnessed byGarcia Title of samplerQA
Telephone number of sampler17029172503 Laboratory sample identification
Linked DIME Sample ID The fabricator/manufacturer/facility nameMartinez steel
Transportation Laboratory (TL) Number Inspector Lot Number from the Transportation Laboratory (TL) FormL115-014-22
Structure unique identifier Structure name
Bid ItemNot set

Material Information

Material TypeSMTL TM5 - Welded Hoops Production or Authorization TestingProduction Testing
Service or UltimateUltimate Rebar Heat Number(s)183522
Hoop Manufacturer Lot Number(s)Lot 6, 7, 8 Material Standard CodeASTM A706
Material Grade60 Rebar Size#7
Diameter of Hoop2'-6" Epoxy CoatedNo
Epoxy Coating ColorNA Rebar ManufacturerCascade Steel
Welding CompanyMartinez Steel Coating StandardsUncoated
Weld TypeFlash Welded

Submitted Tests

DIME Test IDTest MethodTester Name, Testing LabDate TestedDate AddedVerified?Release DateTest CommentsPrivacy LevelActions
No results found.

Sample File Attachments

File NameExtensionDate UploadedActions
No results found.

Test File Attachments