Project Details
This page displays current information for project DEA: 050L7224.
Project Information
Project Identifiers | Project ID: 214989 DEA: 050L7224 EFIS: 0515000098 |
---|---|
DIST-CO-RTE-PM | 05-SLO-1-34.5 |
Award Date | 10/13/2021 |
Closeout Date | Not set |
Work Description | REPLACE BRIDGE. |
Location Description | SAN LUIS OBISPO COUNTY NEAR MORRO BAY AT OLD CREEK BRIDGE |
QA Service Level | 1 (Verified on 09/03/2020) |
Samples
Samples submitted for this project.
Displaying 1-10 of 15 results.
DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
---|---|---|---|---|---|
2023-03-09-3 | 03/09/2023 | 03/09/2023 | Quality Assurance | Soil | View |
2022-11-10-3 | 11/10/2022 | 11/10/2022 | Quality Assurance | Concrete | View |
2022-08-08-1 | 08/08/2022 | 08/10/2022 | Quality Assurance | SMTL TM5 - Welded Hoops | View |
2022-08-08-2 | 08/08/2022 | Quality Control | SMTL TM5 - Welded Hoops | View | |
2022-08-01-4 | 08/01/2022 | 08/02/2022 | Acceptance | SMTL TM5 - Welded Hoops | View |
2022-08-01-5 | 08/01/2022 | 08/02/2022 | Acceptance | SMTL TM5 - Welded Hoops | View |
2022-07-19-6 | 07/19/2022 | Quality Control | SMTL TM5 - Welded Hoops | View | |
2022-07-18-1 | 07/18/2022 | 07/25/2022 | Quality Assurance | SMTL TM5 - Welded Hoops | View |
2022-07-18-2 | 07/18/2022 | Quality Control | SMTL TM5 - Welded Hoops | View | |
2022-07-05-1 | 07/05/2022 | 07/11/2022 | Quality Assurance | SMTL TM5 - Welded Hoops | View |
Job Mix Formula (JMF)
JMFs associated with this project.
JMF ID | Status | Submitted By | Created By | Date Created | Link |
---|---|---|---|---|---|
No results found. |
Environmental Product Declaration (EPD)
EPDs submitted for this project.
Declaration Number | Program Operator | Material Type | Vendor | Submitted by |
---|---|---|---|---|
No results found. |
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods