Sample Record

Owner Lab

  • CT D07 - Materials Field Laboratory, Unit 1953

DIME Sample ID 2022-07-22-16

Project Information

Project IdentifiersProject ID: 993116
DEA: 07320004
EFIS: 0716000029
DIST-CO-RTE-PM07-LA-14-R31.4/36.5
Award Date09/08/2021
Closeout Date11/01/2023
Work DescriptionINSTALL WIRED MESH DRAPERY SYSTEM AND SLOPE AND ROADSIDE PAVING.
Location DescriptionLOS ANGELES COUNTY IN SANTA CLARITA FROM CANYON PARK BOULEVARD UNDERCROSSING TO SPRING CANYON ROAD UNDERCROSSING
QA Service Level1 (Verified on 07/12/2021)

Sample Information

Sample Taken Date07/22/2022 Sample Unique Key16
Will the laboratory/organization for which you are a member perform testing on this material sample?Yes Date that the sample was received by the laboratory/organization performing the testing07/22/2022
Sample typeDepartment Acceptance A brief description of the sampleNative Material
The quantity of what the sample constitutes1559.3 sqft From where was the sample collectedJob Site
First name of sampler or witnessed byChad Last name of sampler or witnessed byChotibhongs
Title of samplerMREA Telephone number of sampler213-817-0387
Laboratory sample identification22-1860 Linked DIME Sample ID
The fabricator/manufacturer/facility nameChumo Construction Inc. Transportation Laboratory (TL) Number
Inspector Lot Number from the Transportation Laboratory (TL) Form Structure unique identifier
Structure name

Material Information

Material TypeSoil The fabricator's/manufacturer's product name for the sample
The fabricator/manufacturer designation for the sample A detailed description of where the material sample was collectedCTM 231 Test Holes
Where the material sample would have been placed if not sampled

Submitted Tests

DIME Test IDTest MethodTester Name, Testing LabDate TestedSubmitted ByVerified?Release DateTest CommentsActions
2022-07-22-16-1CTM 216-June 2011: Method of Test for Relative Compaction of Untreated and Treated Soils and AggregatesChad Chotibhongs, CT D07 - Materials Field Laboratory, Unit 195307/22/2022Chad Chotibhongs
Yes
07/22/2022
2022-07-22-16-2CTM 231-March 2013: Method of Test for Relative Compaction of Untreated and Treated Soils and Aggregates Using Nuclear GagesChad Chotibhongs, CT D07 - Materials Field Laboratory, Unit 195307/22/2022Chad Chotibhongs
Yes
07/22/2022

Sample File Attachments

File NameExtensionDate UploadedActions
No results found.

Test File Attachments


DIME Test ID: 2022-07-22-16-1 CTM 216-June 2011 (Verified)
DIME Test ID: 2022-07-22-16-2 CTM 231-March 2013 (Verified)