Sample Record

DIME Sample ID 2015-04-02-6

Project Information

Project IdentifiersProject ID: 209217
DEA: 080F5404
EFIS: 0800000136
COOP: 081468
DIST-CO-RTE-PM08-RIV-91,15-0.0/13.04, 35.64/45.14
Award Date09/09/2013
Closeout Date09/20/2023
Work DescriptionSR-91 Corridor Improvement Project: Develop approx. 8 miles of tolled express lanes and related improvements within SR 91 between the Riverside/Orange County line and I-15, including transition areas.
Location Description08-RIV-91-0.0/13.04; 12-ORA-91-R14.43/R18.91; 08-RIV-15-35.64/45.14
QA Service Level1 (Verified on 08/07/2014)

Owner Lab

  • CT D08 - Fontana Southern Regional Laboratory

Sample Information

Sample Taken Date04/02/2015 Sample Unique Key6
Date that the sample was received by the laboratory/organization performing the testing04/07/2015 Sample typeQuality Control
A brief description of the sample6X12 The quantity of what the sample constitutes10 CYLS
From where was the sample collectedJob Site First name of sampler or witnessed byALIAS AND JOSE
Last name of sampler or witnessed bySALAZAR AND DIAZ Title of samplerTE AND TET
Telephone number of samplerUnknown Laboratory sample identification888-SRL37
Linked DIME Sample IDUnknown The fabricator/manufacturer/facility nameCollected at jobsite
Transportation Laboratory (TL) NumberSRL37 Inspector Lot Number from the Transportation Laboratory (TL) FormUnknown
Structure unique identifierUnknown Structure nameBRIDGE 01 ABUT 1 AND 2 FOOTINGS
Bid ItemNot set

Material Information

Material TypeConcrete The concrete mix design number3X50L001
The truck number from where the sample was collected162 The batch plant ticket number from where the sample was collected118021646
Concrete batch plantUnknown The fabricator/manufacturer designation for the sampleUnknown
A detailed description of where the material sample was collectedfrom mix truck Where the material sample would have been placed if not sampledNot set
From Lot No.Not set Bag Lot No.Not set

Submitted Tests

DIME Test IDTest MethodTester Name, Testing LabDate TestedDate AddedVerified?Release DateTest CommentsPrivacy LevelActions
2015-04-02-6-1CTM 521-November 2014: Method of Test for Compressive Strength of Molded Concrete CylindersMatthew Clayton, CT D08 - Fontana Southern Regional Laboratory04/09/2015
Yes
04/30/2015Public - Test Data Visible
2015-04-02-6-3CTM 521-November 2014: Method of Test for Compressive Strength of Molded Concrete CylindersMatthew Clayton, CT D08 - Fontana Southern Regional Laboratory04/23/2015
Yes
04/23/2015Public - Test Data Visible
2015-04-02-6-7CTM 521-November 2014: Method of Test for Compressive Strength of Molded Concrete CylindersMatthew Clayton, CT D08 - Fontana Southern Regional Laboratory04/16/2015
Yes
04/30/2015Public - Test Data Visible
2015-04-02-6-9CTM 521-November 2014: Method of Test for Compressive Strength of Molded Concrete CylindersMatthew Clayton, CT D08 - Fontana Southern Regional Laboratory04/30/2015
Yes
04/30/2015Public - Test Data Visible
2015-04-02-6-10CTM 521-November 2014: Method of Test for Compressive Strength of Molded Concrete CylindersMatthew Clayton, CT D08 - Fontana Southern Regional Laboratory05/14/2015
Yes
05/14/2015Public - Test Data Visible

Sample File Attachments

File NameExtensionDate UploadedActions
No results found.

Test File Attachments


DIME Test ID: 2015-04-02-6-1 CTM 521-November 2014 (Verified)
DIME Test ID: 2015-04-02-6-3 CTM 521-November 2014 (Verified)
DIME Test ID: 2015-04-02-6-7 CTM 521-November 2014 (Verified)
DIME Test ID: 2015-04-02-6-9 CTM 521-November 2014 (Verified)
DIME Test ID: 2015-04-02-6-10 CTM 521-November 2014 (Verified)