Sample Record
DIME Sample ID 2022-06-16-3
Project Information
| Project Identifiers | Project ID: 212246 DEA: 053307A4 EFIS: 0514000027 |
|---|---|
| DIST-CO-RTE-PM | 05-SLO-46-49.7/54.6 |
| Award Date | 02/16/2022 |
| Closeout Date | 09/02/2025 |
| Work Description | Cholame Segment |
| Location Description | Not set |
| QA Service Level | 1 (Verified on 09/30/2019) |
Owner Lab
- CT D05 - Whitley Gardens Field Laboratory
Sample Information
| Sample Taken Date | 06/16/2022 | Sample Unique Key | 3 |
|---|---|---|---|
| Date that the sample was received by the laboratory/organization performing the testing | 06/16/2022 | Sample type | Quality Assurance |
| A brief description of the sample | Structure Backfill | The quantity of what the sample constitutes | 1+20-1+50 DS37 |
| From where was the sample collected | Job Site | First name of sampler or witnessed by | Aleks |
| Last name of sampler or witnessed by | Tigue | Title of sampler | TET |
| Telephone number of sampler | 805-748-4862 | Laboratory sample identification | 37066sbfill1 |
| Linked DIME Sample ID | The fabricator/manufacturer/facility name | SPM Avenal-Plant | |
| Transportation Laboratory (TL) Number | Inspector Lot Number from the Transportation Laboratory (TL) Form | ||
| Structure unique identifier | Structure name | ||
| Bid Item | Not set |
Material Information
| Material Type | Soil | The fabricator's/manufacturer's product name for the sample | structure backfill |
|---|---|---|---|
| The fabricator/manufacturer designation for the sample | A detailed description of where the material sample was collected | job site DS37 | |
| Where the material sample would have been placed if not sampled |
Submitted Tests
Sample File Attachments
| File Name | Extension | Date Uploaded | Actions |
|---|---|---|---|
| No results found. | |||
Test File Attachments
DIME Test ID: 2022-06-16-3-1 CTM 216-June 2011 (Verified)
