Sample Record
Owner Lab
- CT HQ - QASI Los Angeles Field Office
DIME Sample ID 2022-05-06-3
Sample is locked from editing. info
Project Information
| Project Identifiers | Project ID: 214988 DEA: 050L7214 EFIS: 0515000097 |
|---|---|
| DIST-CO-RTE-PM | 05-SLO-1-32.6 |
| Award Date | 03/08/2021 |
| Closeout Date | 09/16/2025 |
| Work Description | REMOVE & CONSTRUCT CONCRETE BRIDGE, CONCRETE SLAB, BRIDGE RAIL & HMA. |
| Location Description | SAN LUIS OBISPO COUNTY IN MORRO BAY AT TORO CREEK BRIDGE |
| QA Service Level | 1 (Verified on 09/03/2020) |
Sample Information
| Sample Taken Date | 05/06/2022 | Sample Unique Key | 3 |
|---|---|---|---|
| Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 05/09/2022 |
| Sample type | Quality Assurance | A brief description of the sample | #10 HRC 150 T-Headed bars |
| The quantity of what the sample constitutes | 156 Headed Bars Lot 1-2 | From where was the sample collected | Fabricator |
| First name of sampler or witnessed by | Osiel | Last name of sampler or witnessed by | Ramirez |
| Title of sampler | Telephone number of sampler | 5599740870 | |
| Laboratory sample identification | Linked DIME Sample ID | ||
| The fabricator/manufacturer/facility name | HRC Fountain Valley | Transportation Laboratory (TL) Number | |
| Inspector Lot Number from the Transportation Laboratory (TL) Form | L123-046-22 | Structure unique identifier | |
| Structure name | Bid Item | Not set |
Material Information
| Material Type | SMTL TM5 - Headed Bars | Production or Authorization Testing | Production Testing |
|---|---|---|---|
| Rebar Heat Number(s) | 4114532 | Head Manufacturer Lot Number(s) | MM20103137 |
| Rebar Size | #10 | Headed Bar Model Name | HRC 150 T Heads |
| Size of Head | Full Size - 9x | Head Connection Type | Friction Weld |
| Head Shape | Circular | Rebar Manufacturer | CMC Steel Arizona |
| Head Manufacturer | HRC Fountain Valley | Head Fabricator | HRC Fountain Valley |
| Material Standard Code | ASTM A706 | Headed Bar Unique ID | Not set |
Submitted Tests
Sample File Attachments
| File Name | Extension | Date Uploaded | Actions |
|---|---|---|---|
| No results found. | |||
Test File Attachments
DIME Test ID: 2022-05-06-3-1 ASTM A970-18 (Verified)
DIME Test ID: 2022-05-06-3-2 ASTM A970-18 (Verified)
DIME Test ID: 2022-05-06-3-3 ASTM A970-18 (Verified)
DIME Test ID: 2022-05-06-3-4 ASTM A970-18 (Verified)
DIME Test ID: 2022-05-06-3-5 ASTM A970-18 (Verified)
DIME Test ID: 2022-05-06-3-6 ASTM A970-18 (Verified)
