Sample Record

DIME Sample ID 2022-01-28-25

Sample is locked from editing. info

Project Information

Project IdentifiersProject ID: 213749
DEA: 120C1104
EFIS: 1200000633
DIST-CO-RTE-PM12-ORA-57-20.3/21.6
Award Date04/19/2019
Closeout Date05/28/2024
Work DescriptionSR-57 Lambert Interchange Project: WIDEN BRIDGES AND CONSTRUCT RW, SW, HMA, JPCP AND ELECTRICAL SYSTEMS.
Location DescriptionORANGE COUNTY IN BREA FROM 0.6 MILE SOUTH TO 0.7 MILE NORTH OF LAMBERT ROAD UNDERCROSSING
QA Service Level1 (Verified on 05/31/2019)

Owner Lab

  • CT HQ - Sacramento Structural Materials Testing Laboratory

Sample Information

Sample Taken Date01/28/2022 Sample Unique Key25
Date that the sample was received by the laboratory/organization performing the testing02/14/2022 Sample typeQuality Assurance
A brief description of the sample Couplers The quantity of what the sample constitutes4
From where was the sample collectedJob Site First name of sampler or witnessed byT
Last name of sampler or witnessed byTran Title of sampler
Telephone number of sampler Laboratory sample identification
Linked DIME Sample ID The fabricator/manufacturer/facility nameCamblin Steel
Transportation Laboratory (TL) NumberC378332 Inspector Lot Number from the Transportation Laboratory (TL) Form
Structure unique identifier Structure name
Bid ItemNot set

Material Information

Material TypeSMTL TM5 - Couplers Production or Authorization TestingProduction Testing
Service or UltimateUltimate Material Standard CodeASTM A706
Material Grade60 Rebar ManufacturerCMC
Coupler ManufacturerHRC Intermediate Assembler or Fabricator
Rebar Size#11 Coupler ModelHRC 500/510
Coating StandardsUncoated Shape of RebarStraight
Rebar Hoop Diameter Rebar Hoop Fabricator
Coupler Component Heat/Lot Number(s)74123596, 58047320/05 Rebar Heat Number(s)4114587
Rebar Size 2 Coupler Unique IDNot set

Submitted Tests

DIME Test IDTest MethodTester Name, Testing LabDate TestedDate AddedVerified?Release DateTest CommentsPrivacy LevelActions
2022-01-28-25-1CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Cyclical/Fatique Tensile with Slip)bewing, CT HQ - Sacramento Structural Materials Testing Laboratory02/16/202202/16/2022
Yes
02/25/2022Ok NeckingPublic - Test Data Visible
2022-01-28-25-2CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Cyclical/Fatique Tensile with Slip)bewing, CT HQ - Sacramento Structural Materials Testing Laboratory02/16/202202/16/2022
Yes
02/25/2022Ok NeckingPublic - Test Data Visible
2022-01-28-25-3CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Cyclical/Fatique Tensile with Slip)bewing, CT HQ - Sacramento Structural Materials Testing Laboratory02/16/202202/16/2022
Yes
02/25/2022Ok NeckingPublic - Test Data Visible

Sample File Attachments

File NameExtensionDate UploadedActions
No results found.

Test File Attachments


DIME Test ID: 2022-01-28-25-1 CTM 670-December 2013 (Verified)
DIME Test ID: 2022-01-28-25-2 CTM 670-December 2013 (Verified)
DIME Test ID: 2022-01-28-25-3 CTM 670-December 2013 (Verified)