Sample Record

Owner Lab

  • CT D08 - Fontana Southern Regional Laboratory

DIME Sample ID 2021-09-24-47

Project Information

Project IdentifiersProject ID: 212112
DEA: 080C2514
EFIS: 0816000076
COOP: 081645
DIST-CO-RTE-PM08-SBD-10-0.0/13.2
Award Date06/06/2018
Closeout DateNot set
Work DescriptionDesign-Build of I-10 Corridor Contract 1 - Adding 2 new Express Lanes
Location DescriptionLA/SBD County Line to PM 13.2 near I-15
QA Service Level1 (Verified on 10/16/2019)

Sample Information

Sample Taken Date09/24/2021 Sample Unique Key47
Date that the sample was received by the laboratory/organization performing the testing10/15/2021 Sample typeQuality Assurance
A brief description of the sample6x12 The quantity of what the sample constitutes4
From where was the sample collectedJob Site First name of sampler or witnessed byrammy
Last name of sampler or witnessed bym Title of sampler
Telephone number of sampler Laboratory sample identification1015-924
Linked DIME Sample ID The fabricator/manufacturer/facility namenp
Transportation Laboratory (TL) Number1015-924 Inspector Lot Number from the Transportation Laboratory (TL) Form
Structure unique identifier Structure name
Bid ItemNot set

Material Information

Material TypeConcrete The concrete mix design number1610974
The truck number from where the sample was collected1007485 The batch plant ticket number from where the sample was collectednot provided
Concrete batch plant The fabricator/manufacturer designation for the sample
A detailed description of where the material sample was collectedjob Where the material sample would have been placed if not sampledabutment 2 approach slabs
From Lot No. Bag Lot No.

Submitted Tests

DIME Test IDTest MethodTester Name, Testing LabDate TestedDate AddedVerified?Release DateTest CommentsPrivacy LevelActions
No results found.

Sample File Attachments

File NameExtensionDate UploadedActions
No results found.

Test File Attachments