Sample Record

Owner Lab

  • CT HQ - Sacramento Structural Materials Testing Laboratory

DIME Sample ID 2021-07-23-12

Sample is locked from editing. info

Project Information

Project IdentifiersProject ID: 7613
DEA: 071218W4
EFIS: 0700021119
DIST-CO-RTE-PM07-LA-5-29.4/31.6
Award Date11/29/2012
Closeout Date07/31/2023
Work DescriptionREALIGN ROUTE 5 AND RAILROAD TRACKS AND RECONFIGURE ON- AND OFF-RAMPS.
Location DescriptionLOS ANGELES COUNTY IN BURBANK FROM WEST MAGNOLIA BOULEVARD OVERCROSSING TO 0.3 MILE NORTH OF BUENA VISTA STREET/WINONA AVENUE UNDERCROSSING
QA Service Level1 (Verified on 10/08/2012)

Sample Information

Sample Taken Date07/23/2021 Sample Unique Key12
Date that the sample was received by the laboratory/organization performing the testing07/30/2021 Sample typeQuality Assurance
A brief description of the sampleGriptwist Couplers The quantity of what the sample constitutes4
From where was the sample collectedJob Site First name of sampler or witnessed byDerek
Last name of sampler or witnessed byChung Title of sampler
Telephone number of sampler Laboratory sample identification
Linked DIME Sample ID The fabricator/manufacturer/facility nameVinton BarSplice
Transportation Laboratory (TL) NumberC686468 Inspector Lot Number from the Transportation Laboratory (TL) Form
Structure unique identifier Structure name
Bid ItemNot set

Material Information

Material TypeSMTL TM5 - Couplers Production or Authorization TestingProduction Testing
Service or UltimateService Material Standard CodeASTM A706
Material Grade60 Rebar ManufacturerVinton Steel
Coupler ManufacturerBarSplice Intermediate Assembler or Fabricator
Rebar Size#9 Coupler ModelGrip Twist Couplers
Coating StandardsUncoated Shape of RebarStraight
Rebar Hoop Diameter Rebar Hoop Fabricator
Coupler Component Heat/Lot Number(s)A201362 Rebar Heat Number(s)2111007
Rebar Size 2 Coupler Unique IDNot set

Submitted Tests

DIME Test IDTest MethodTester Name, Testing LabDate TestedDate AddedVerified?Release DateTest CommentsPrivacy LevelActions
2021-07-23-12-1CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Cyclical/Fatique Tensile with Slip)fsaylor, CT HQ - Sacramento Structural Materials Testing Laboratory07/30/202107/30/2021
Yes
08/02/2021Service SplicePublic - Test Data Visible
2021-07-23-12-2CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Cyclical/Fatique Tensile with Slip)fsaylor, CT HQ - Sacramento Structural Materials Testing Laboratory07/30/202107/30/2021
Yes
08/02/2021Service SplicePublic - Test Data Visible
2021-07-23-12-3CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Cyclical/Fatique Tensile with Slip)fsaylor, CT HQ - Sacramento Structural Materials Testing Laboratory07/30/202107/30/2021
Yes
08/02/2021Service SplicePublic - Test Data Visible

Sample File Attachments

File NameExtensionDate UploadedActions
No results found.

Test File Attachments


DIME Test ID: 2021-07-23-12-1 CTM 670-December 2013 (Verified)
DIME Test ID: 2021-07-23-12-2 CTM 670-December 2013 (Verified)
DIME Test ID: 2021-07-23-12-3 CTM 670-December 2013 (Verified)