Sample Record

Owner Lab

  • CT D08 - Fontana Field Testing Laboratory

DIME Sample ID 2021-02-09-33

Sample is locked from editing. info

Project Information

Project IdentifiersProject ID: 213707
DEA: 081C38U4
EFIS: 0817000196
DIST-CO-RTE-PM08-RIV-10-6.7/R25.1
Award Date11/26/2019
Closeout Date11/01/2023
Work DescriptionRemove concrete pavement and base, and place HMA and JPCP
Location DescriptionROUTE 10/60 SEPARATION IN BEAUMONT TO ROUTE 10/111 SEPARATION NEAR CABAZON.
QA Service Level1 (Verified on 01/09/2020)

Sample Information

Sample Taken Date02/09/2021 Sample Unique Key33
Date that the sample was received by the laboratory/organization performing the testing02/10/2021 Sample typeQuality Assurance
A brief description of the samplePCC Rapid set beams The quantity of what the sample constitutes3 beams
From where was the sample collectedJob Site First name of sampler or witnessed byQC
Last name of sampler or witnessed byQC Title of sampler
Telephone number of sampler Laboratory sample identification1RA, 1RB,1RC
Linked DIME Sample ID The fabricator/manufacturer/facility nameGL THROOP
Transportation Laboratory (TL) Number Inspector Lot Number from the Transportation Laboratory (TL) Form
Structure unique identifier Structure name
Bid ItemNot set

Material Information

Material TypeConcrete The concrete mix design number1906-33
The truck number from where the sample was collectedUnknown The batch plant ticket number from where the sample was collectedtt
Concrete batch plantUnknown The fabricator/manufacturer designation for the sampleUnknown
A detailed description of where the material sample was collectedDischarge from concrete truck into wheelbarrow Where the material sample would have been placed if not sampledUnknown
From Lot No.Unknown Bag Lot No.Unknown

Submitted Tests

DIME Test IDTest MethodTester Name, Testing LabDate TestedDate AddedVerified?Release DateTest CommentsPrivacy LevelActions
2021-02-09-33-1CTM 524-March 2013: Method of Test for Flexural Strength Of Rapid Strength ConcreteM. Warde, R. Osorio, CT D08 - Fontana Field Testing Laboratory02/19/2021
Yes
02/20/2021Public - Test Data Visible
2021-02-09-33-2CTM 524-March 2013: Method of Test for Flexural Strength Of Rapid Strength ConcreteM. Warde, R. Osorio, CT D08 - Fontana Field Testing Laboratory02/19/2021
Yes
02/20/2021Public - Test Data Visible
2021-02-09-33-3CTM 524-March 2013: Method of Test for Flexural Strength Of Rapid Strength ConcreteM. Warde, R. Osorio, CT D08 - Fontana Field Testing Laboratory02/19/2021
Yes
02/20/2021Public - Test Data Visible

Sample File Attachments

File NameExtensionDate UploadedActions
No results found.

Test File Attachments


DIME Test ID: 2021-02-09-33-1 CTM 524-March 2013 (Verified)
DIME Test ID: 2021-02-09-33-2 CTM 524-March 2013 (Verified)