Sample Record
DIME Sample ID 2020-12-07-2
Project Information
| Project Identifiers | Project ID: 99999 DEA: 0322222 |
|---|---|
| DIST-CO-RTE-PM | 03-SAC,OMG-888,99,80-0.6-0.6 |
| Award Date | Not set |
| Closeout Date | Not set |
| Work Description | THIS PROJECT RECORD WAS ADDED FOR DIME TESTERS - DATA SUBMITTED FOR THIS PROJECT SHOULD NOT BE USED FOR ANY OTHER PURPOSES. |
| Location Description | THIS PROJECT RECORD WAS ADDED FOR DIME TESTERS - DATA SUBMITTED FOR THIS PROJECT SHOULD NOT BE USED FOR ANY OTHER PURPOSES. |
| QA Service Level | (Verified on 04/05/2013) |
Owner Lab
- CT HQ - Sacramento Structural Materials Testing Laboratory
Sample Information
| Sample Taken Date | 12/07/2020 | Sample Unique Key | 2 |
|---|---|---|---|
| Date that the sample was received by the laboratory/organization performing the testing | 12/07/2020 | Sample type | Authorization |
| A brief description of the sample | #4 service splice coupler | The quantity of what the sample constitutes | 4 |
| From where was the sample collected | Fabricator | First name of sampler or witnessed by | David |
| Last name of sampler or witnessed by | Murray | Title of sampler | Materials Engineer |
| Telephone number of sampler | 9136395549 | Laboratory sample identification | NA |
| Linked DIME Sample ID | The fabricator/manufacturer/facility name | Erico | |
| Transportation Laboratory (TL) Number | Inspector Lot Number from the Transportation Laboratory (TL) Form | ||
| Structure unique identifier | Structure name | ||
| Bid Item | Not set |
Material Information
| Material Type | SMTL TM5 - Couplers | Production or Authorization Testing | Authorization Testing |
|---|---|---|---|
| Service or Ultimate | Service | Material Standard Code | ASTM A706 |
| Material Grade | 60 | Rebar Manufacturer | Cascade |
| Coupler Manufacturer | Erico | Intermediate Assembler or Fabricator | |
| Rebar Size | #4 | Coupler Model | Mechanical |
| Coating Standards | Uncoated | Shape of Rebar | Straight |
| Rebar Hoop Diameter | Rebar Hoop Fabricator | ||
| Coupler Component Heat/Lot Number(s) | MM18108717/0007 | Rebar Heat Number(s) | 261520 |
| Rebar Size 2 | Coupler Unique ID | Not set |
Submitted Tests
| DIME Test ID | Test Method | Tester Name, Testing Lab | Date Tested | Date Added | Verified? | Release Date | Test Comments | Privacy Level | Actions |
|---|---|---|---|---|---|---|---|---|---|
| 2020-12-07-2-1 | CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Cyclical/Fatique Tensile with Slip) | fsaylor, CT HQ - Sacramento Structural Materials Testing Laboratory | 01/15/2021 | 01/15/2021 | No | 10K Service Splice | |||
| 2020-12-07-2-2 | CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Cyclical/Fatique Tensile with Slip) | fsaylor, CT HQ - Sacramento Structural Materials Testing Laboratory | 01/15/2021 | 01/15/2021 | No | 100 cycle Service Splice | |||
| 2020-12-07-2-3 | CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Cyclical/Fatique Tensile with Slip) | fsaylor, CT HQ - Sacramento Structural Materials Testing Laboratory | 01/15/2021 | 01/15/2021 | No | Service Splice | |||
| 2020-12-07-2-4 | CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Cyclical/Fatique Tensile with Slip) | fsaylor, CT HQ - Sacramento Structural Materials Testing Laboratory | 01/15/2021 | 01/15/2021 | No | Service Splice |
Sample File Attachments
| File Name | Extension | Date Uploaded | Actions |
|---|---|---|---|
| No results found. | |||
Test File Attachments
DIME Test ID: 2020-12-07-2-1 CTM 670-December 2013
DIME Test ID: 2020-12-07-2-2 CTM 670-December 2013
DIME Test ID: 2020-12-07-2-3 CTM 670-December 2013
DIME Test ID: 2020-12-07-2-4 CTM 670-December 2013
