Sample Record
DIME Sample ID 2020-05-28-11
Project Information
| Project Identifiers | Project ID: 214680 DEA: 030F2854 EFIS: 0319000205 |
|---|---|
| DIST-CO-RTE-PM | 03-SAC-99-7.1/9.4 |
| Award Date | 04/06/2020 |
| Closeout Date | 10/30/2020 |
| Work Description | Construct the temporary bridge superstructures, adjacent paving and pave temporary alignment |
| Location Description | Not set |
| QA Service Level | 1 (Verified on 03/02/2020) |
Owner Lab
- CT HQ - Sacramento Asphalt Binder Laboratory
Sample Information
| Sample Taken Date | 05/28/2020 | Sample Unique Key | 11 |
|---|---|---|---|
| Date that the sample was received by the laboratory/organization performing the testing | 06/03/2020 | Sample type | Department Acceptance |
| A brief description of the sample | EMULSION | The quantity of what the sample constitutes | 1 bottle |
| From where was the sample collected | Job Site | First name of sampler or witnessed by | Gabriel |
| Last name of sampler or witnessed by | Paras | Title of sampler | TE |
| Telephone number of sampler | Laboratory sample identification | ||
| Linked DIME Sample ID | The fabricator/manufacturer/facility name | Pacific Northwest Oil - Stockton, CA | |
| Transportation Laboratory (TL) Number | 739756 | Inspector Lot Number from the Transportation Laboratory (TL) Form | |
| Structure unique identifier | Structure name | ||
| Bid Item | Not set |
Material Information
| Material Type | Asphaltic Emulsion | Emulsion Grade | SS-1h |
|---|---|---|---|
| Lot Number | 0 | Sub Lot | 0 |
| Dilution Percentage Rate | Not set |
Submitted Tests
Sample File Attachments
| File Name | Extension | Date Uploaded | Actions |
|---|---|---|---|
| No results found. | |||
Test File Attachments
DIME Test ID: 2020-05-28-11-1 AASHTO T59-16 (Verified)
