Project Details
This page displays current information for project DEA: 030F2854.
Project Information
Project Identifiers | Project ID: 214680 DEA: 030F2854 EFIS: 0319000205 |
---|---|
DIST-CO-RTE-PM | 03-SAC-99-7.1/9.4 |
Award Date | 04/06/2020 |
Closeout Date | 10/30/2020 |
Work Description | Construct the temporary bridge superstructures, adjacent paving and pave temporary alignment |
Location Description | Not set |
QA Service Level | 1 (Verified on 03/02/2020) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
Email Address | Full Name | Role | Personnel Source |
---|---|---|---|
Masoud.Saed@dot.ca.gov | Masoud Saed | Resident Engineer | Caltrans RE DB |
chau.ha@dot.ca.gov | Chau Ha | Structural Representative | Caltrans SR DB |
Samples
Samples submitted for this project.
Displaying 1-10 of 42 results.
DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
---|---|---|---|---|---|
2022-08-08-77 | 08/08/2022 | 08/08/2022 | Informational | Hot Mix Asphalt | View |
2022-08-06-17 | 08/06/2022 | 08/06/2022 | Informational | Hot Mix Asphalt | View |
2022-08-06-16 | 08/06/2022 | 08/06/2022 | Informational | Hot Mix Asphalt | View |
2020-06-06-1 | 06/06/2020 | 06/09/2020 | Department Acceptance | Asphaltic Emulsion | View |
2020-05-28-11 | 05/28/2020 | 06/03/2020 | Department Acceptance | Asphaltic Emulsion | View |
2020-05-20-11 | 05/20/2020 | 05/27/2020 | Department Acceptance | Asphaltic Emulsion | View |
2020-05-14-29 | 05/14/2020 | 05/18/2020 | Department Acceptance | Asphaltic Emulsion | View |
2020-05-13-6 | 05/13/2020 | 05/15/2020 | Quality Assurance | Concrete | View |
2020-04-02-13 | 04/02/2020 | 04/03/2020 | Quality Control | Concrete | View |
2020-04-01-13 | 04/01/2020 | 04/02/2020 | Quality Control | Concrete | View |
Job Mix Formula (JMF)
JMFs associated with this project.
JMF ID | Status | Submitted By | Created By | Date Created | Link |
---|---|---|---|---|---|
No results found. |
Environmental Product Declaration (EPD)
EPDs material quantities submitted for this project.
Declaration Number | Material Type | Vendor | Submitted by | Quantity |
---|---|---|---|---|
No results found. |