Sample Record
Owner Lab
- CT D08 - Fontana Southern Regional Laboratory
DIME Sample ID 2019-09-27-18
Project Information
| Project Identifiers | Project ID: 213763 DEA: 060Q19A4 EFIS: 0613000152 |
|---|---|
| DIST-CO-RTE-PM | 06-KER-58-R99.0/R100.3 |
| Award Date | 02/04/2019 |
| Closeout Date | 10/22/2021 |
| Work Description | WIDEN SHOULDERS AND REPLACE BRIDGES |
| Location Description | KERN COUNTY NEAR TEHACHAPI FROM 0.5 MILE WEST TO 0.8 MILE EAST OF SAND CANYON UNDERCROSSING |
| QA Service Level | 1 (Verified on 01/09/2019) |
Sample Information
| Sample Taken Date | 09/27/2019 | Sample Unique Key | 18 |
|---|---|---|---|
| Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 10/07/2019 |
| Sample type | Quality Assurance | A brief description of the sample | 6x12 concrete cylinders |
| The quantity of what the sample constitutes | 2 | From where was the sample collected | Job Site |
| First name of sampler or witnessed by | adial | Last name of sampler or witnessed by | Evans |
| Title of sampler | ASR | Telephone number of sampler | |
| Laboratory sample identification | 994-927 | Linked DIME Sample ID | |
| The fabricator/manufacturer/facility name | readymix | Transportation Laboratory (TL) Number | 20190927 |
| Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | ||
| Structure name | Abutment 2 five piles within footing footprint | Bid Item | Not set |
Material Information
| Material Type | Concrete | The concrete mix design number | 3H40G004 |
|---|---|---|---|
| The truck number from where the sample was collected | 307 | The batch plant ticket number from where the sample was collected | 112016600 |
| Concrete batch plant | Unknown | The fabricator/manufacturer designation for the sample | granite |
| A detailed description of where the material sample was collected | truck | Where the material sample would have been placed if not sampled | Abutment 2 five piles within footing footprint |
| From Lot No. | Unknown | Bag Lot No. | Unknown |
Submitted Tests
| DIME Test ID | Test Method | Tester Name, Testing Lab | Date Tested | Date Added | Verified? | Release Date | Test Comments | Privacy Level | Actions |
|---|---|---|---|---|---|---|---|---|---|
| 2019-09-27-18-1 | ASTM C39-10: Standard Test Method for Compressive Strength of Cylindrical Concrete Specimens | MM, CT D08 - Fontana Southern Regional Laboratory | 10/25/2019 | No |
Sample File Attachments
| File Name | Extension | Date Uploaded | Actions |
|---|---|---|---|
| No results found. | |||
Test File Attachments
DIME Test ID: 2019-09-27-18-1 ASTM C39-10
