Project Details
This page displays current information for project DEA: 060Q19A4.
Project Information
Project Identifiers | Project ID: 213763 DEA: 060Q19A4 EFIS: 0613000152 |
---|---|
DIST-CO-RTE-PM | 06-KER-58-R99.0/R100.3 |
Award Date | 02/04/2019 |
Closeout Date | 10/22/2021 |
Work Description | WIDEN SHOULDERS AND REPLACE BRIDGES |
Location Description | KERN COUNTY NEAR TEHACHAPI FROM 0.5 MILE WEST TO 0.8 MILE EAST OF SAND CANYON UNDERCROSSING |
QA Service Level | 1 (Verified on 01/09/2019) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
Email Address | Full Name | Role | Personnel Source |
---|---|---|---|
hin.hartanto@dot.ca.gov | Hin Hartanto | Resident Engineer | Caltrans RE DB |
jegbefume.adodo@dot.ca.gov | Jegbefume Adodo | Structural Representative | Caltrans SR DB |
Samples
Samples submitted for this project.
Displaying 1-10 of 20 results.
DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
---|---|---|---|---|---|
2020-06-04-15 | 06/04/2020 | 06/05/2020 | Quality Assurance | Concrete | View |
2020-06-05-26 | 06/05/2020 | 06/05/2020 | Quality Assurance | Concrete | View |
2020-02-17-1 | 02/17/2020 | 02/21/2020 | Quality Assurance | Concrete | View |
2020-02-13-13 | 02/13/2020 | 02/14/2020 | Department Acceptance | Hot Mix Asphalt | View |
2020-02-12-3 | 02/12/2020 | 02/13/2020 | Verification | Aggregate | View |
2019-11-20-13 | 11/20/2019 | 11/25/2019 | Quality Assurance | Aggregate | View |
2019-11-20-12 | 11/20/2019 | 11/25/2019 | Quality Assurance | Aggregate | View |
2019-11-20-11 | 11/20/2019 | 11/22/2019 | Quality Assurance | Aggregate | View |
2020-01-06-28 | 01/06/2020 | 01/11/2020 | Quality Assurance | Concrete | View |
2019-11-20-10 | 11/20/2019 | 11/22/2019 | Quality Assurance | Concrete | View |
Job Mix Formula (JMF)
JMFs associated with this project.
JMF ID | Status | Submitted By | Created By | Date Created | Link |
---|---|---|---|---|---|
No results found. |
Environmental Product Declaration (EPD)
EPDs material quantities submitted for this project.
Declaration Number | Material Type | Vendor | Submitted by | Quantity |
---|---|---|---|---|
No results found. |
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods