Sample Record

DIME Sample ID 2017-12-16-1

Sample is locked from editing. info

Project Information

Project IdentifiersProject ID: 209217
DEA: 080F5404
EFIS: 0800000136
COOP: 081468
DIST-CO-RTE-PM08-RIV-91,15-0.0/13.04, 35.64/45.14
Award Date09/09/2013
Closeout Date09/20/2023
Work DescriptionSR-91 Corridor Improvement Project: Develop approx. 8 miles of tolled express lanes and related improvements within SR 91 between the Riverside/Orange County line and I-15, including transition areas.
Location Description08-RIV-91-0.0/13.04; 12-ORA-91-R14.43/R18.91; 08-RIV-15-35.64/45.14
QA Service Level1 (Verified on 08/07/2014)

Owner Lab

  • CT D08 - Fontana Southern Regional Laboratory

Sample Information

Sample Taken Date12/16/2017 Sample Unique Key1
Date that the sample was received by the laboratory/organization performing the testing12/16/2017 Sample typeQuality Assurance
A brief description of the sample6X12 The quantity of what the sample constitutes6
From where was the sample collectedJob Site First name of sampler or witnessed byELIAS
Last name of sampler or witnessed byAHMAD Title of samplerALZUBI
Telephone number of samplerUnknown Laboratory sample identification888-SRL405
Linked DIME Sample IDUnknown The fabricator/manufacturer/facility nameHolliday Rock Chino
Transportation Laboratory (TL) NumberSRL405 Inspector Lot Number from the Transportation Laboratory (TL) FormUnknown
Structure unique identifier91CIP Structure name91 WB AT MAIN ST ON RAMP
Bid ItemNot set

Material Information

Material TypeConcrete The concrete mix design numberCM4261
The truck number from where the sample was collected684 The batch plant ticket number from where the sample was collected118066962
Concrete batch plantUnknown The fabricator/manufacturer designation for the sampleUnknown
A detailed description of where the material sample was collectedNP Where the material sample would have been placed if not sampled91 WB AT MAIN ST ON RAMP
From Lot No.Unknown Bag Lot No.Unknown

Submitted Tests

DIME Test IDTest MethodTester Name, Testing LabDate TestedDate AddedVerified?Release DateTest CommentsPrivacy LevelActions
2017-12-16-1-1ASTM C39-17a: Standard Test Method for Compressive Strength of Cylindrical Concrete SpecimensMatthew Clayton, CT D08 - Fontana Southern Regional Laboratory12/19/2017
Yes
12/21/2017PLEASE NOTE THIS IS 10 HOUR BREAK DIME IS NOT ALLOWING TO INPUT CYLINDER AGE AS HOURS Public - Test Data Visible
2017-12-16-1-2ASTM C39-17a: Standard Test Method for Compressive Strength of Cylindrical Concrete SpecimensMatthew Clayton, CT D08 - Fontana Southern Regional Laboratory12/26/2017
Yes
12/26/2017Public - Test Data Visible

Sample File Attachments

File NameExtensionDate UploadedActions
No results found.

Test File Attachments


DIME Test ID: 2017-12-16-1-1 ASTM C39-17a (Verified)
DIME Test ID: 2017-12-16-1-2 ASTM C39-17a (Verified)