Sample Record

DIME Sample ID 2025-12-08-3

Project Information

Project IdentifiersProject ID: 1000004
DEA: 033H5604
EFIS: 0318000014
DIST-CO-RTE-PM03-PLA,NEV-20,80-VAR
Award Date05/10/2024
Closeout DateNot set
Work DescriptionSTRUCTURAL CONC, BAR REINFORCING STEEL, BRIDGE REMOVAL, HMA, AND JPCP.
Location DescriptionPLACER AND NEVADA COUNTIES NEAR CISCO GROVE ON ROUTE 80 FROM 0.4 MILE WEST OF LAKE VALLEY OVERCROSSING TO 0.9 MILE EAST OF YUBA PASS SEPARATION AND OVERHEAD AND ON ROUTE 20 AT YUBA PASS SEPARATION AND OVERHEAD
QA Service Level1 (Verified on 01/18/2024)

Owner Lab

  • CT D03 - Rocklin Construction Field Office

Sample Information

Sample Taken Date12/08/2025 Sample Unique Key3
Date that the sample was received by the laboratory/organization performing the testingNot set Sample typeAcceptance
A brief description of the sampleSkid Testing Request The quantity of what the sample constitutesmultiple lanes
From where was the sample collectedJob Site First name of sampler or witnessed byJimmer
Last name of sampler or witnessed byRoss Title of sampler
Telephone number of sampler Laboratory sample identification
Linked DIME Sample ID The fabricator/manufacturer/facility nameFlatiron
Transportation Laboratory (TL) Number Inspector Lot Number from the Transportation Laboratory (TL) Form
Structure unique identifier17-0107R Structure nameYuba Pass Separation and OH Bridge
Bid ItemNot set

Material Information

Material TypeRoadway/Bridge Surface Pavement Surface TypePCC (Portland Cement Concrete)
Type of Traffic Control ProvidedBehind K-Rail/Barrier DIST-CO-RTE03-Nev-80
Direction of TravelEast Post Mile
Lanes to be TestedLane #1,Lane #2 Station59.5

Submitted Tests

DIME Test IDTest MethodTester Name, Testing LabDate TestedDate AddedVerified?Release DateTest CommentsPrivacy LevelActions
No results found.

Sample File Attachments

File NameExtensionDate UploadedActions
No results found.

Test File Attachments