Sample Record

Owner Lab

  • CT D04 - Concord Field Laboratory

DIME Sample ID 2024-10-04-6

Project Information

Project IdentifiersProject ID: 1000017
DEA: 042Q7004
EFIS: 0419000040
DIST-CO-RTE-PM04-CC-4-L0.0/R14.3
Award Date04/26/2024
Closeout DateNot set
Work DescriptionREPLACE ASPHALT CONCRETE SURFACING AND INSTALL MGS.
Location DescriptionCONTRA COSTA COUNTY IN HERCULES AND CONCORD FROM SAN PABLO AVENUE TO ROUTE 4/242 SEPARATION
QA Service Level1 (Verified on 01/08/2024)

Sample Information

Sample Taken Date10/04/2024 Sample Unique Key6
Will the laboratory/organization for which you are a member perform testing on this material sample?Yes Date that the sample was received by the laboratory/organization performing the testing10/04/2024
Sample typeQuality Assurance A brief description of the samplePCC Beam testing 3 hour test
The quantity of what the sample constitutes250 cy From where was the sample collectedSupplier
First name of sampler or witnessed byDan Last name of sampler or witnessed byRingler
Title of samplerLab Technician Telephone number of sampler
Laboratory sample identification Linked DIME Sample ID
The fabricator/manufacturer/facility nameVanguard mobile plant # 887 Martinez Transportation Laboratory (TL) Number
Inspector Lot Number from the Transportation Laboratory (TL) Form Structure unique identifier
Structure name Bid ItemNot set

Material Information

Material TypeConcrete The concrete mix design numberHE4X4BM
The truck number from where the sample was collected The batch plant ticket number from where the sample was collected4752
Concrete batch plant The fabricator/manufacturer designation for the sample
A detailed description of where the material sample was collectedAt job site from the transportation truck Where the material sample would have been placed if not sampled
From Lot No. Bag Lot No.

Submitted Tests

DIME Test IDTest MethodTester Name, Testing LabDate TestedDate AddedVerified?Release DateTest CommentsPrivacy LevelActions
2024-10-04-6-1CTM 524-March 2013: Method of Test for Flexural Strength Of Rapid Strength ConcreteNicholas Hall, CT D04 - Concord Field Laboratory10/04/202410/04/2024
Yes
10/04/2024Spec min 400 PSIPublic - Test Data Visible

Sample File Attachments

File NameExtensionDate UploadedActions
No results found.

Test File Attachments


DIME Test ID: 2024-10-04-6-1 CTM 524-March 2013 (Verified)