Project Details
This page displays current information for project DEA: 042Q7004.
Project Information
Project Identifiers | Project ID: 1000017 DEA: 042Q7004 EFIS: 0419000040 |
---|---|
DIST-CO-RTE-PM | 04-CC-4-L0.0/R14.3 |
Award Date | 04/26/2024 |
Closeout Date | Not set |
Work Description | REPLACE ASPHALT CONCRETE SURFACING AND INSTALL MGS. |
Location Description | CONTRA COSTA COUNTY IN HERCULES AND CONCORD FROM SAN PABLO AVENUE TO ROUTE 4/242 SEPARATION |
QA Service Level | 1 (Verified on 01/08/2024) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
Email Address | Full Name | Role | Personnel Source |
---|---|---|---|
rabindra.mukherjee@dot.ca.gov | Rabindra Mukherjee | Resident Engineer | Caltrans RE DB |
john.parecadan@dot.ca.gov | John K. Parecadan | Structural Representative | Caltrans SR DB |
dylan.larose@dot.ca.gov | Dylan Larose | METS REP | Caltrans METS REP DB |
Samples
Samples submitted for this project.
Displaying 1-10 of 69 results.
DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
---|---|---|---|---|---|
2025-04-07-28 | 04/07/2025 | 04/08/2025 | Quality Assurance | Hot Mix Asphalt | View |
2025-04-04-21 | 04/04/2025 | 04/07/2025 | Quality Assurance | Hot Mix Asphalt | View |
2025-04-04-20 | 04/04/2025 | 04/07/2025 | Quality Assurance | Aggregate | View |
2025-04-03-53 | 04/03/2025 | 04/04/2025 | Quality Assurance | Hot Mix Asphalt | View |
2025-04-03-52 | 04/03/2025 | 04/04/2025 | Quality Assurance | Aggregate | View |
2025-03-28-25 | 03/28/2025 | 03/28/2025 | Quality Assurance | Hot Mix Asphalt | View |
2025-04-02-27 | 04/02/2025 | 04/03/2025 | Quality Assurance | Hot Mix Asphalt | View |
2025-03-25-47 | 03/25/2025 | 03/26/2025 | Quality Assurance | Hot Mix Asphalt | View |
2025-04-02-26 | 04/02/2025 | 04/03/2025 | Quality Assurance | Aggregate | View |
2025-04-01-16 | 04/01/2025 | 04/03/2025 | Quality Assurance | Hot Mix Asphalt | View |
Job Mix Formula (JMF)
JMFs associated with this project.
JMF ID | Status | Submitted By | Created By | Date Created | Link |
---|---|---|---|---|---|
No results found. |
Precast Concrete Forms
Project DEA | DIME Sample ID | Sample Taken Date | Link |
---|---|---|---|
No results found. |
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods