Sample Record
DIME Sample ID 2019-03-15-11
Sample is locked from editing. info
Project Information
| Project Identifiers | Project ID: 213470 DEA: 06394604 EFIS: 0600020595 |
|---|---|
| DIST-CO-RTE-PM | 06-FRE-269-10.6/12.4 |
| Award Date | 11/02/2018 |
| Closeout Date | 10/15/2020 |
| Work Description | REPLACE BRIDGES AND RECONSTRUCT ROADWAY. |
| Location Description | FRESNO COUNTY NEAR HURON FROM 1.0 MILE NORTH OF PALMER AVENUE TO 0.4 MILE SOUTH OF ROUTE 198 |
| QA Service Level | 1 (Verified on 09/25/2018) |
Owner Lab
- CT HQ - Sacramento Structural Materials Testing Laboratory
Sample Information
| Sample Taken Date | 03/15/2019 | Sample Unique Key | 11 |
|---|---|---|---|
| Date that the sample was received by the laboratory/organization performing the testing | 03/15/2019 | Sample type | Retest |
| A brief description of the sample | UBS Hoops | The quantity of what the sample constitutes | 1050 hoops |
| From where was the sample collected | Fabricator | First name of sampler or witnessed by | David |
| Last name of sampler or witnessed by | Weeks | Title of sampler | QA |
| Telephone number of sampler | 310-883-8369 | Laboratory sample identification | |
| Linked DIME Sample ID | The fabricator/manufacturer/facility name | TNT Rebar | |
| Transportation Laboratory (TL) Number | Inspector Lot Number from the Transportation Laboratory (TL) Form | L79-123-19 | |
| Structure unique identifier | Not set | Structure name | Not set |
| Bid Item | Not set |
Material Information
| Material Type | SMTL TM5 - Welded Hoops | Production or Authorization Testing | Authorization Testing |
|---|---|---|---|
| Service or Ultimate | Ultimate | Rebar Heat Number(s) | 4083637 |
| Hoop Manufacturer Lot Number(s) | 12A, 24A, 28A | Material Standard Code | ASTM A706 |
| Material Grade | 60 | Rebar Size | 5 |
| Diameter of Hoop | 1'-4" | Epoxy Coated | No |
| Epoxy Coating Color | NA | Rebar Manufacturer | CMC |
| Welding Company | TNT Rebar | Coating Standards | Uncoated |
| Weld Type | Flash Welded |
Submitted Tests
Go to page:
Sample File Attachments
| File Name | Extension | Date Uploaded | Actions |
|---|---|---|---|
| No results found. | |||
Test File Attachments
DIME Test ID: 2019-03-15-11-1 CTM 670-December 2013 (Verified)
DIME Test ID: 2019-03-15-11-2 CTM 670-December 2013 (Verified)
DIME Test ID: 2019-03-15-11-3 CTM 670-December 2013 (Verified)
DIME Test ID: 2019-03-15-11-4 CTM 670-December 2013 (Verified)
DIME Test ID: 2019-03-15-11-5 CTM 670-December 2013 (Verified)
DIME Test ID: 2019-03-15-11-6 CTM 670-December 2013 (Verified)
DIME Test ID: 2019-03-15-11-7 CTM 670-December 2013 (Verified)
DIME Test ID: 2019-03-15-11-8 CTM 670-December 2013 (Verified)
DIME Test ID: 2019-03-15-11-9 CTM 670-December 2013 (Verified)
DIME Test ID: 2019-03-15-11-10 CTM 670-December 2013 (Verified)
DIME Test ID: 2019-03-15-11-11 CTM 670-December 2013 (Verified)
DIME Test ID: 2019-03-15-11-12 CTM 670-December 2013 (Verified)
