Project Details

This page displays current information for project DEA: 06394604.

Project Information

Project IdentifiersProject ID: 213470
DEA: 06394604
EFIS: 0600020595
DIST-CO-RTE-PM06-FRE-269-10.6/12.4
Award Date11/02/2018
Closeout Date10/15/2020
Work DescriptionREPLACE BRIDGES AND RECONSTRUCT ROADWAY.
Location DescriptionFRESNO COUNTY NEAR HURON FROM 1.0 MILE NORTH OF PALMER AVENUE TO 0.4 MILE SOUTH OF ROUTE 198
QA Service Level1 (Verified on 09/25/2018)

Caltrans Project Personnel

Personnel stored in Caltrans' project databases.

Email AddressFull NameRolePersonnel Source
din.dadawalla@dot.ca.govDin DadawallaResident EngineerCaltrans RE DB
nathan.quiroz@dot.ca.govNathan QuirozStructural RepresentativeCaltrans SR DB
justin.palmaymesa@dot.ca.govJustin PalmaymesaMETS REPCaltrans METS REP DB

Samples

Samples submitted for this project.

Displaying 1-10 of 25 results.
DIME Sample IDSample Taken DateSample Received DateSample TypeMaterial TypeLink
2019-05-15-1305/15/201905/24/2019Quality AssuranceSMTL TM7 - Epoxy Coated RebarView
2019-04-17-204/17/201904/22/2019Quality AssuranceSMTL TM5 - Welded HoopsView
2019-04-15-104/15/201904/17/2019Quality AssuranceSMTL TM5 - Welded HoopsView
2019-04-10-204/10/201904/16/2019Quality AssuranceSMTL TM5 - Welded HoopsView
2019-04-10-304/10/201904/16/2019Quality ControlSMTL TM5 - Welded HoopsView
2019-04-10-704/10/201904/12/2019Quality ControlSMTL TM5 - Welded HoopsView
2019-04-10-804/10/201904/12/2019Quality AssuranceSMTL TM5 - Welded HoopsView
2019-04-05-104/05/201904/05/2019Quality AssuranceSMTL TM5 - Welded HoopsView
2019-03-25-203/25/201903/25/2019Quality AssuranceSMTL TM5 - Welded HoopsView
2019-03-15-303/15/201903/15/2019Quality AssuranceSMTL TM5 - Welded HoopsView

Job Mix Formula (JMF)

JMFs associated with this project.

JMF IDStatusSubmitted ByCreated ByDate CreatedLink
No results found.

Environmental Product Declaration (EPD)

EPDs material quantities submitted for this project.

Declaration NumberMaterial TypeVendorSubmitted byQuantity
No results found.

Project Summary Graphs


Samples Taken and Tests performed per Month


Number of Samples

Sample Types

Number of Tests

Test Types

Material Types

Test Methods