Summary for Test 2020-10-06-21-2
Test performed: AASHTO T301-13Project Information
Project Identifiers | Project ID: 214685 DEA: 024E46U4 EFIS: 0216000122 |
---|---|
DIST-CO-RTE-PM | 02-LAS-36-6.0/14.6 |
Award Date | 05/08/2020 |
Closeout Date | 08/14/2023 |
Work Description | REPLACE BRIDGE, ROADWAY EXCAVATION, HMA, CLASS 2 AB AND DRAINAGE WORK. |
Location Description | LASSEN COUNTY NEAR WESTWOOD FROM 1.3 MILES WEST OF GOODRICH CREEK BRIDGE TO 1.0 MILE WEST OF WILLARD CREEK ROAD |
QA Service Level | 1 (Verified on 03/02/2020) |
Sample Information
Sample Taken Date | 10/06/2020 | Sample Unique Key | 21 |
---|---|---|---|
Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 10/15/2020 |
Sample type | Acceptance | A brief description of the sample | Asphalt Binder PG 58-34M |
The quantity of what the sample constitutes | #11 Test, NO Test #12(896942), #13(897034) | From where was the sample collected | Source |
First name of sampler or witnessed by | CGI | Last name of sampler or witnessed by | CGI |
Title of sampler | Telephone number of sampler | ||
Laboratory sample identification | Linked DIME Sample ID | ||
The fabricator/manufacturer/facility name | Marathon | Transportation Laboratory (TL) Number | 896941 |
Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | ||
Structure name |
Material Information
Material Type | Asphalt Binder | Performance Grade | PG 58-34 M |
---|---|---|---|
Modified | Yes | Lot number | |
Sublot number | Tank number | Not set | |
Time of sample | Not set | HMA Supplier | Not set |
Certified Asphalt Supplier | Not set | Multigrade | Not set |
Multigrade Type | Not set | Asphalt Binder Mix Number | Not set |
Test Details
DIME Sample ID: 2020-10-06-21
DIME Test ID: 2020-10-06-21-2
Testing Lab: CT HQ - Sacramento Asphalt Binder Laboratory
Test Method: AASHTO T301-13: Standard Method of Test for Elastic Recovery Test of Asphalt Materials by Means of a Ductilometer
Test Release Date: 2020-10-28
Test Results
Input Type: Measured
Tester's full name: Harish Thakur
Date of test: 10/19/2020
Final Reading from the testing machine (X): 2 cm
% Elongation Recovery: 90 %
General comments (publicly viewable) (Max 1000 characters): as per 2018 standard specs
Test was verified on 10/28/2020 ✔