Summary for Test 2020-09-29-40-1

Test performed: AASHTO T240-17
Warning: The test results shown on this page have been superseded and are invalid. This information is for reference only.

Project Information

Project IdentifiersProject ID: 212777
DEA: 021H1104
EFIS: 0215000106
DIST-CO-RTE-PM02-LAS-299-25.58/25.58
Award Date12/04/2019
Closeout Date08/14/2023
Work DescriptionBUILDING WORK.
Location DescriptionLASSEN COUNTY ABOUT 11 MILES EAST OF BIEBER AT THE ADIN MAINTENANCE STATION
QA Service Level1 (Verified on 01/08/2019)

Sample Information

Sample Taken Date09/29/2020 Sample Unique Key40
Will the laboratory/organization for which you are a member perform testing on this material sample?Yes Date that the sample was received by the laboratory/organization performing the testing10/09/2020
Sample typeAcceptance A brief description of the sampleAB PG 64-28M #1 Test, No Test #2(036754), #3(036755),#4(036756),
The quantity of what the sample constitutes1 can From where was the sample collectedSource
First name of sampler or witnessed bydorell Last name of sampler or witnessed byharper
Title of sampler Telephone number of sampler
Laboratory sample identification Linked DIME Sample ID
The fabricator/manufacturer/facility nameAlbina - Klamath Falls, OR Transportation Laboratory (TL) Number036753
Inspector Lot Number from the Transportation Laboratory (TL) Form Structure unique identifier
Structure name

Material Information

Material TypeAsphalt Binder Performance GradePG 64-28 M
ModifiedYes Lot number
Sublot number Tank numberNot set
Time of sampleNot set HMA SupplierNot set
Certified Asphalt SupplierNot set MultigradeNot set
Multigrade TypeNot set Asphalt Binder Mix NumberNot set

Test Details

DIME Sample ID: 2020-09-29-40
DIME Test ID: 2020-09-29-40-1
Testing Lab: CT HQ - Sacramento Asphalt Binder Laboratory
Test Method: AASHTO T240-17: Standard Method of Test for Effect of Heat and Air on a Moving Film of Asphalt Binder (Rolling Thin-Film Oven Test)
Test Release Date: 2020-10-12

Test Results


Is mass change based on one or two containers?: One
Input Type: Measured
Tester's full name: Harish Thakur
Date of test: 10/12/2020
Any material loss from containers during heating process/testing?: No
Mass of empty container #1: 177.824 grams
Mass of container #1 before test (m1i): 213.774 grams
Mass of container #1 after test (m1f): 213.664 grams
Average mass change: -0.306 percent
General comments (publicly viewable) (Max 1000 characters):

Test was verified on 10/12/2020

Warning: The test results shown on this page have been superseded and are invalid. This information is for reference only.