Summary for Test 2020-09-21-36-2
Test performed: AASHTO T51-13Project Information
Project Identifiers | Project ID: 214731 DEA: 051M0004 EFIS: 0519000047 |
---|---|
DIST-CO-RTE-PM | 05-SLO-101-16.5/R21.5 |
Award Date | 04/22/2020 |
Closeout Date | 08/23/2021 |
Work Description | COLD PLANE AND RHMA-GAP GRADED OVERLAY ON EXISTING ROADWAY. |
Location Description | SAN LUIS OBISPO COUNTY IN AND NEAR PISMO BEACH FROM 0.1 MILE SOUTH OF PRICE CANYON ROAD TO SAN LUIS CREEK BRIDGE |
QA Service Level | 1 (Verified on 05/29/2020) |
Sample Information
Sample Taken Date | 09/21/2020 | Sample Unique Key | 36 |
---|---|---|---|
Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 09/29/2020 |
Sample type | Department Acceptance | A brief description of the sample | #20 Test, #21(200922E) ,#22(200922E), #23(200924E) No Test |
The quantity of what the sample constitutes | 1 Can | From where was the sample collected | Source |
First name of sampler or witnessed by | SPM | Last name of sampler or witnessed by | QC |
Title of sampler | Telephone number of sampler | ||
Laboratory sample identification | Linked DIME Sample ID | ||
The fabricator/manufacturer/facility name | CalPortland Garey Plant | Transportation Laboratory (TL) Number | 200921E |
Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | ||
Structure name |
Material Information
Material Type | Asphalt Binder | Performance Grade | PG 64-16 |
---|---|---|---|
Modified | No | Lot number | |
Sublot number | Tank number | Not set | |
Time of sample | Not set | HMA Supplier | Not set |
Certified Asphalt Supplier | Not set | Multigrade | Not set |
Multigrade Type | Not set | Asphalt Binder Mix Number | Not set |
Test Details
DIME Sample ID: 2020-09-21-36
DIME Test ID: 2020-09-21-36-2
Testing Lab: CT HQ - Sacramento Asphalt Binder Laboratory
Test Method: AASHTO T51-13: Standard Method of Test for Ductility of Asphalt Materials (Asphalt Binder)
Test Release Date: 2020-10-08
Test Results
Is a normal test obtainable?: Yes
Number of replicates tested: One
Input Type: Measured
Tester's full name: Harish Thakur
Date of test: 10/06/2020
Ductility of test #1 (D1): 75 cm
Ductility of sample: 75 cm
General comments (publicly viewable) (Max 1000 characters): per 2018 standard specs
Test was verified on 10/8/2020 ✔