Summary for Test 2020-08-17-48-1
Test performed: AASHTO T240-17
Warning: The test results shown on this page have been superseded and are invalid.
This information is for reference only.
Project Information
Project Identifiers | Project ID: 44444 DEA: ASCP EFIS: ASCP |
---|---|
DIST-CO-RTE-PM | 59--- |
Award Date | Not set |
Closeout Date | Not set |
Work Description | Special project for submitting Sample information for Asphalt Supplier Certification Program. |
Location Description | Not set |
QA Service Level | NOT VERIFIED |
Sample Information
Sample Taken Date | 08/17/2020 | Sample Unique Key | 48 |
---|---|---|---|
Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 09/29/2020 |
Sample type | Verification | A brief description of the sample | rcvd 1 can of PG58-34 M |
The quantity of what the sample constitutes | 1 Can | From where was the sample collected | Manufacturer |
First name of sampler or witnessed by | Don | Last name of sampler or witnessed by | Powell |
Title of sampler | Telephone number of sampler | 661-327-8248 | |
Laboratory sample identification | Linked DIME Sample ID | ||
The fabricator/manufacturer/facility name | San Joaquin Refinery, Bakersfield, CA | Transportation Laboratory (TL) Number | 20583405 |
Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | ||
Structure name |
Material Information
Material Type | Asphalt Binder | Performance Grade | PG 58-34 M |
---|---|---|---|
Modified | Yes | Lot number | |
Sublot number | Tank number | Not set | |
Time of sample | Not set | HMA Supplier | Not set |
Certified Asphalt Supplier | Not set | Multigrade | Not set |
Multigrade Type | Not set | Asphalt Binder Mix Number | Not set |
Test Details
DIME Sample ID: 2020-08-17-48
DIME Test ID: 2020-08-17-48-1
Testing Lab: CT HQ - Sacramento Asphalt Binder Laboratory
Test Method: AASHTO T240-17: Standard Method of Test for Effect of Heat and Air on a Moving Film of Asphalt Binder (Rolling Thin-Film Oven Test)
Test Release Date: 2020-10-20
Test Results
Is mass change based on one or two containers?: One
Input Type: Measured
Tester's full name: Harish Thaur
Date of test: 10/01/2020
Any material loss from containers during heating process/testing?: No
Mass of empty container #1: 167.748 grams
Mass of container #1 before test (m1i): 203.042 grams
Mass of container #1 after test (m1f): 203.023 grams
Average mass change: -0.054 percent
General comments (publicly viewable) (Max 1000 characters):
Test was verified on 10/20/2020 ✔
Warning: The test results shown on this page have been superseded and are invalid.
This information is for reference only.