Summary for Test 2020-09-18-21-9
Test performed: CTM 202-November 2011Project Information
Project Identifiers | Project ID: 211260 DEA: 072159U4 EFIS: 0715000160 |
---|---|
DIST-CO-RTE-PM | 07-LA,ORA-5-0.0/1.5, 44.3/44.4 |
Award Date | 05/27/2016 |
Closeout Date | 08/01/2023 |
Work Description | CONSTRUCT HOV LANES AND MIX FLOW LANES. |
Location Description | LOS ANGELES AND ORANGE COUNTIES IN BUENA PARK, LA MIRADA, CERRITOS AND SANTA FE SPRINGS FROM ARTESIA BOULEVARD UNDERCROSSING TO NORTH FORK COYOTE CREEK |
QA Service Level | 1 (Verified on 03/16/2016) |
Sample Information
Sample Taken Date | 09/18/2020 | Sample Unique Key | 21 |
---|---|---|---|
Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 09/22/2020 |
Sample type | Verification | A brief description of the sample | JMF 3/4" HMA-A-SP R21 0.50% LAS |
The quantity of what the sample constitutes | 4 Bags Coldfeed Agg., 3 Bags Rap | From where was the sample collected | Manufacturer |
First name of sampler or witnessed by | Honesto | Last name of sampler or witnessed by | Castillo |
Title of sampler | Telephone number of sampler | ||
Laboratory sample identification | 0544A-20 | Linked DIME Sample ID | |
The fabricator/manufacturer/facility name | Vulcan Materials- Irwindale | Transportation Laboratory (TL) Number | |
Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | ||
Structure name |
Material Information
Material Type | Aggregate | Source Identification (SMARA, name of Pit or Job Site) | 91-19-0035::FISH CANYON QUARRY |
---|---|---|---|
The fabricator's/manufacturer's product name for the sample | 3/4 HMA-A-SP | The fabricator/manufacturer designation for the sample | |
The plant number | 220817A IRW SJR | A detailed description of where the material sample was collected | Belt Cut at Vulcan Materials-Irwindale |
Where the material sample would have been placed if not sampled | Asphalt Paving | Primary Aggregate Nominal Size | 3/4 inch |
The concrete mix design number | Lot number | ||
Sublot number | Aggregate Mix Number | Not set |
Test Details
DIME Sample ID: 2020-09-18-21
DIME Test ID: 2020-09-18-21-9
Testing Lab: CT D08 - Fontana Southern Regional Laboratory
Test Method: CTM 202-November 2011: Method of Test for Sieve Analysis of Fine and Coarse Aggregates
Test Release Date: 2020-09-30
Test Results
What size aggregate is being tested?: Combined Gradation
Individual or cumulative mass retained on each sieve?: Cumulative Mass Retained
For Combined Gradation only, has the fine aggregate sample been reduced?: No
For Combined Gradation only, use #40 Sieve?: No
Input Type: Calculated
Tester's full name: Satish Jain
Date of test: 09/26/2020
Cumulative percent passing the 3 in. sieve: 100 %
Cumulative percent passing the 2 1/2 in. sieve: 100 %
Cumulative percent passing the 2 in. sieve: 100 %
Cumulative percent passing the 1 1/2 in. sieve: 100 %
Cumulative percent passing the 1 in. sieve: 100 %
Cumulative percent passing the 3/4 in. sieve: 100 %
Cumulative percent passing the 1/2 in. sieve: 100 %
Cumulative percent passing the 3/8 in. sieve: 98 %
Cumulative percent passing the #4 sieve: 76 %
Cumulative percent passing the #8 sieve: 55 %
Cumulative percent passing the #16 sieve: 41 %
Cumulative percent passing the #30 sieve: 31 %
Cumulative percent passing the #50 sieve: 22 %
Cumulative percent passing the #100 sieve: 15 %
Cumulative percent passing the #200 sieve: 10 %
General comments (publicly viewable) (Max 1000 characters): Rap Gradation After Ignition
Test was verified on 9/30/2020 ✔